Town CrierWest Orange, New Jersey
← Back to search

Minutes · Feb 4, 2015

February 4, 2015

Preserved file SHA-256b18654ce4ee5db0a7b587081e3344b8a94a7369620c1a6caf15b265340ff18c5

Indexed text · page 2

Show all pages
Page 2

RESOLUTION(S) PB-14-26/Jersey Pizza, Inc. Block: 17; Lot: 5; Zone: B-1 335 Valley Road Jersey Pizza, Inc. Preliminary and Final Site Plan with “C” Variance. DISCUSSION None. The Board voted on the Resolution as follows: Motion: Chairman Heller Second: Councilwoman McCartney Bagoff: Yes Carlucci: - | Eben: Absent | Ghebremicael: - Gurland: Yes Klein: ~ | Lester: - McCartney: Yes Weston: Absent | Wilkes: - | Heller: Yes APPLICATION(S) PB-14-06/AutoZone Northeast, Inc. Store No. 4744 Block: 60; Lots: 1.01 and 2.01; Zone: B-1 7 Main Street Preliminary and final major site plan and minor subdivision with “c” variances. Carried from the July 2, 2014 regular meeting. EXHIBITS A-1: Site/Subdivision Plan (Drawing C1.0), prepared by Gregg E. Ursprung, P.E., Bergmann Associates dated January 16, 2014, revised June 27, 2014; A-2:; Landscape Plan (Drawing L1.0) prepared by Gregg E. Ursprung, P.E., Bergmann Associates dated January 16, 2014, revised June 27, 2014; A-3: Exterior Elevations and Notes (Drawing A-2) prepared by Lew Ellis, dated January 14, 2014; A-4: Traffic Impact Assessment prepared by Gary W. Dean, P.E., P.P, and Elizabeth Dolan, P.E., Dolan & Dean Consulting Engineers, LLC dated July 1, 2014. Frank DeVito, Esq., attorney for Applicant addressed the Board; the Applicant wanted to go forward with the project; the Applicant had provided revised plans (revised through January 20, 2015), to the Board based on comments of the July 2, 2014 meeting; the entire project had been essentially redesigned. Gregg E. Ursprung, P.E., Bergmann Associates, was sworn in, and accepted by the Board to be an expert in engineering. Referring to his letter to the Board dated January 22, 2015, (included in the submission of revised plans); Mr. Ursprung discussed changes to the site plan that included: (A) One parking space was removed from the west side of the parking area in front of the store and replaced with landscaping. (B) One parking space was eliminated in the parking area on the northern side of the store and converted into a landscaped island; this parking area had been

File revisions (1)