Minutes · May 21, 2015
May 21, 2015
9f59b4affd91041ea46f482ce37844287a5a84ec5b3119ef399fb6dd23b58ddeIndexed text · page 6
Show all pagesMr. Petry replied that that there is a fire hydrant located at the driveway to the caretakers house. However it has been requesting for it to be relocated to the Southerly side of that driveway. Chairman Buechler asked if the Fire Dept. has responded to that request. He was told by Mr. Petry that they have not. The Chairman stated that it would have to be a condition. Both Mr. Petry and Mr. Williams agreed. Mr. Williams asked Mr. Petry about two pillars at the entryway to the site one of which contains a small sign. Mr. Petry informed him that the idea for the monument sign by the driveway came from the Crestmont Country Club and they actually mimicked their pillars and signage. Ms. Weiss asked if that was in their package. Mr. Petry replied that it was on the detail sheet. There was a dialogue regarding this matter between Mr. Petry and Ms. Weiss. Mr. Petry stated he had nothing further. Mr. Williams said he had a couple of more questions for him. Mr. Willams and Mr. Petry had a dialogue highlighting the changes, which Mr. Petry testified to, from the first application and concluded that the major change was that the building was moved forward and a better buffer was provided. Ms. Weiss stated that a major change according to Mr. Grygiel’s report was the existing building being demolished. In response to Ms. Weiss’s statement both Mr. Williams and Mr. Petry confirmed that the existing building would be totally demolished. Mr. Williams stated that they met with a neighbors to the rear of the property and owners of Lot 22.05 wanted additional trees planted on their property. The applicant agreed to plant the trees. Since it is not part of the plan he wants to make it a condition of approval to represent that they will comply with the neighbors request. Chairman Buechler asked where would deliveries to the temple be received. Mr. Petry responded that all deliveries would happen in the front where there is actually a ramp access so deliveries can come into the drop off lane and load into the front and pull out. Chairman Buechler asked if the temple hours of operation are the same as what they were previously testified to be and if it still was a two story building. Mr. Petry responded that the temple hours were the same as previously testified to and that it was a two story building with a partial basement which the architect will get
was a two story building. Mr. Petry responded that the temple hours were the same as previously testified to and that it was a two story building with a partial basement which the architect will get into. Chairman Buechler asked if there is an elevator with the changes.
File revisions (1)
- Sep 29, 2026
9f59b4affd917,964,981 bytes