Minutes · Jan 21, 2016
January 21, 2016
76f17d5a098a45bfa11e7171c302a5182c1e82842f64410d53638f81438d5c2cIndexed text · page 15
Show all pagesChairman Neuer asked Mr. Keller how many handicap parking spaces they require; he said four. Mr. Keller asked Mr. Marinelli if they could reconfigure the dumpster enclosure and bring it closer to the building. Mr. Keller said that currently it is placed on top of an existing inlet and you cannot have an inlet inside your dumpster enclosure. Mr. Keller directed Mr. Marinelli to revise the plans to either move the dumpster or the inlet. Mr. Grygiel stated for the record that the plans that were submitted this evening were never submitted on full size plans; he said he never saw the parking plan ahead of time. Mr. Marinelli said that the only sheet that was submitted was the geometry sheet showing where they could provide ten (10) additional parking spaces. Mr. Grygiel said that a full size set of plans must be revised that reflect what was discussed at the meeting this evening. Chairman Neuer stated that revised plans must be submitted at least ten (10 days before the next hearing. There were no further questions for Mr. Marinelli from the Board Members, the Board Professionals or members of the public. Mr. Williams called his next witness. Barry Brommer approached the podium and was sworn under oath. Mr. Brommer detailed his educational and professional background as a licensed architect in the State of New Jersey. Chairman Neuer asked Mr. Brommer if his license is suspended or has ever been suspended; he replied no. Chairman Neuer accepted Mr. Brommer as an expert in Architecture. Mr. Brommer presented sheet A-1 of the architectural plans, dated August 18, 2015 that were pre-marked as Exhibit A-5 for identification. Mr. Brommer referred to Exhibit A-5 and detailed the need for the larger space and the outdoor area where the addition will be built He stated that the design of the building has a more contemporary look and described the exterior materials that will be used on the addition. Mr. Brommer detailed the interior design stating that it is more like an apartment that will be used for rehabilitation patients. He said that there is also a large storage space in the design. 15
File revisions (1)
- Sep 29, 2026
76f17d5a098a5,307,017 bytes