Minutes · Jul 21, 2016
July 21, 2016
5d0cee0fd172800f0b605ef04feac9af71abc79396258f9a1a491f13bf076e69Indexed text · page 9
Show all pagesconstructed on the southerly side prior to the resolution. 2. Applicant must use clean fill 3. Seepage pit will be moved to the center of the back yard and revised plans must be submitted showing that and the PVC piping being installed to connect the seepage pit with the downspouts or the leaders, as applicable 4. Soil erosion materials required on all sides 5. Wall will be one (1) foot from the property line — surveyor required to come out and mark the property Applicant must use a licensed contractor. No weep holes along the wall facing 88 Lawrence Avenue The wall must be built according to the plans Applicant must replace the bushes he removed from the neighbor’s property 39 po ST ON Ms. Gabry seconded the motion to approve the application and added two conditions: 10. Letter from the applicant’s neighbor stating that the applicant can remove the tree that is on their property 11. The applicant cannot access the neighbor’s property at 88 Lowell Avenue to construct the wall Chairman Neuer called for the vote. Mr. DarConte stated that the issue is not the retaining wall; he said the dirt that the applicant brought in created an issue and then it required a wall. Mr. DarConte said that is the issue. Mr. Quentzel said he is concerned about the safety of the children playing in the yard and he feels that planting trees along the wall will help the aesthetics. Mr. Schwarzbaum encouraged the applicant to talk to the neighbors at 88 Lowell Avenue and put up arborvitae.
File revisions (1)
- Sep 29, 2026
5d0cee0fd1724,502,249 bytes