Minutes · Oct 4, 2017
October 4, 2017
a572675931cfc39b936dee13e3fda135379b9e21139c637ae441121f5fe7d3d3Indexed text · page 2
Show all pagesMr. Dwyer advised the Board there were corrections identified by the Secretary, including the Applicant’s address and the date of the Approval. The Board voted on the corrected Resolution as follows: Motion: Mr. Eben Second: Mr. Cardoza Cardoza: Yes Trenk: Yes Eben: Yes Wegner: Yes Ghebremicael: Absent Weston: - Klein: Absent Wilkes: - Keigher: Yes Bagoff: | Absent McCartney: - Mr. Weston announced a brief recess at approximately 7:51 P.M. to allow for the arrival of Chairman Bagoff to hear Application PB-17-08/Crestmont Country Club. Chairman Bagoff reconvened the meeting at approximately 7:57 P.M. APPLICATION PB-17-08/Crestmont Country Club Block: 174, Lots: 1 & 1.01, Zone: R-2 750 Eagle Rock Avenue Preliminary and Final Major Site Plan with “C” variances. Carried from the September 6, 2017 regular meeting. APPLICANT EXHIBITS A-1: Main Level Furniture Floor Plan, Page 4A, dated 9/1/17, JGA Architectural Design; A-2: Lower Level Floor Finishes Plan, Page 2, dated 9/1/17, JGA Architectural Design; A-3: Main Level Floor Finishes Plan, Page 4, dated 9/1/17, JGA Architectural Design; A-4: Proposed Exterior Renderings (2) Guest & Member Entry View, Course View, Page 6, dated 9/1/17, JGA Architectural Design; A-5: Proposed Exterior Color Rendering — Finishes for Guest Entry, Roof, Ladies Lounge, Front & Side Elevations, Page 7, dated 9/1/17, JGA Architectural Design; A-6: Pool Plan, Page 26, dated 9/1/17, JGA Architectural Design; A-7: Exterior Pool Rendering, Page 27, dated 9/1/17, JGA Architectural Design; A-8: Lower Level Floor Plan, part of response letter dated 9/4/17; 3 drawings A1.0, A1.1, A3.1 (undated) issued in response to Bowman Memo dated 8/31/17 (Exhibit for Testimonial Purposes only); A-9: Color Rending Site Plan, Drawing No. 17-126-SP-1, dated 8/31/17, Boswell Engineering; A-10: Color Rendering Steep Slope Analysis-Existing Conditions, Drawing No. 17-126-SS- 1, dated 9/1/17, Boswell Engineering; A-11: Site Plan Drawing Set, 17 Sheets, Revised 8/24/17, Boswell Engineering DISCUSSION Richard J. Angowski, Jr., Esq., Olender Feldman, appeared on behalf of Applicant. He stated the hearing was a continuation of the the September 6, 2017 meeting. Subsequent to that meeting, the Applicant had submitted updated and revised plans. The revised plans had removed a portion of the Application that had raised some consternation with some
File revisions (1)
- Sep 29, 2026
a572675931cf8,133,589 bytes