RESOLUTION(S) REDEVELOPMENT PLAN 300 Executive Drive Redevelopment Plan Block 155, Lot 42.01 Heyer, Gruel & Associates APPROVED 7/11/18 DISCUSSION: Mr. Dwyer stated the Resolution was based on the revised Redevelopment Plan dated July 13, 2018, which included the requested modifications for Sustainability and Circulation Elements in accordance with the Township’s Master Plan. The Board voted on the Resolution as follows: Motion: Chairman Bagoff Second: Vice Chairman Weston Cardoza: Yes Wegner: - Keigher: = Weston: Yes Klein: : Wilkes: = McCartney: Yes Bagoff: Yes McPherson: Yes Trenk: Yes APPLICATION(S) PB-18-05C/West Orange Board of Education/West Orange High School Block: 154, Lots: 20.01 & 20.03 and Block: 154.18, Lots: 10, 11, 12, 13 & 14 Zone: R-5 Courtesy Review Application for Weight Room Air Structure Replacement. DISCUSSION: Salvatore Alfieri, Esq., Cleary, Giacobbe, Alfieri, Jacobs, LLC, appeared on behalf of the Applicant. He stated the Applicant proposed to replace the existing fabric structure. Anthony Catana, RA, Spiezle Architectural Group, In., was sworn in, stated his professional credentials, and was accepted by the Board to be an expert witness in architecture. He stated the School District proposed to replace the existing air structure that had collapsed last year with a new air structure. The existing structure had been in place for approximately fourteen years; during the last major snowfall of the past year the structure was damaged and could not be re-inflated. It was a fabric structure inflated with air; it was constantly pressurized and air-conditioned. The plan was to remove the old fabric structure and replace it with a new one to include new lighting, mechanical and electrical equipment. The existing foundation, utility service and transformer would remain in place. The new structure would be the same size as the current one; approximately 135 feet long and 75

File revisions (1)