Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Date unavailable

PB-18-09/Kessler Foundation, Inc. Amended

Preserved file SHA-25627d6939ddd420bb5f4faaf80aa25b003f5434b051c13c6c071c54b502146d0dd

Indexed text · page 1

Show all pages
Page 1

AMENDED RESOLUTION OF APPROVAL PLANNING BOARD OF THE TOWNSHIP OF WEST ORANGE Decided: October 3, 2018 Memorialized: November 7, 2018 Amended: December 5, 2018 Kessler Foundation, Inc. Amended Preliminary and Final Site Plan Approval With “c” Variances 1199 Pleasant Valley Way Block 171, Lot 10 PB-18-09 WHEREAS Kessler Foundation, Inc. (the “Applicant”) having an address at 120 Eagle Rock Avenue, Suite 100, East Hanover, NJ 07936 having made application for Amended Final Site Plan Approval with “c” variances for premises at 1199 Pleasant Valley Way, West Orange, NJ also known as Block 171, Lot 10 on the tax map of the Township of West Orange (the “Premises”); and WHEREAS the Board having conducted a public hearing on this application on October 3, 2018; and WHEREAS the Applicant having appeared by Robert Williams, Esq. and by witness J. Michael Petry, PE, PP, and the Board having received review letters from Township Planner Paul Grygiel, AICP dated August 10, 2018 and September 19, 2018, and a review letter from Board Consulting Engineer Bowman dated September 28, 2018, and having granted an opportunity for public comment; and having deliberated on the merits of the application; and WHEREAS the Applicant having also requested a soil moving permit; IT IS HEREBY RESOLVED: EVIDENCE SUBMITTED In summary, the following evidence was received and/or introduced in connection with this application: 1. A West Orange Planning Board application, and the following: i, Proposal/Reasons for Relief; ii. Schedule A — Variance Requests; iii. Schedule B — List of Plat Submissions and Exhibits; iv. Map showing 200’ radius; v. Sustainability Checklist Form; vi. Site Plan/Subdivision Checklist; vii. | Stormwater Management Facility Maintenance Plan Manual prepared by Petry Engineering, LLC dated August 7, 2018; viii. Survey prepared by ZL Land Surveying, LLC dated August 8, 2011, last

File revisions (1)