Minutes · Mar 21, 2019
March 21, 2019
f1bb71975af14162a5f1220b87abe32c59a804a15fa156303ced52d843c7e9afIndexed text · page 3
Show all pagesSWEARING IN Paul Phillips, acting consulting Planner for the Township and John J. Hess, Consulting Engineer for the Township, were sworn under oath. RESOLUTIONS 1. ZB-18-08/B’Nai Shalom Approved on 2/21/19 Block: 152.23; Lot: 1434; Zone: R- 300 Pleasant Valley Way Seeking use variance, “c” variance and amended site plan approvals to permit a childcare center in an existing synagogue. Chairman Neuer stated that this resolution was circulated to all of the Board Members and that this version included comments from himself. Chairman Neuer asked if any Board Member had any other comments; there were none. Mr. Schwarzbaum made a motion to adopt the resolution as submitted and Ms. Gabry seconded the motion. The vote was as follows: Eben: - Steinhart: Yes Gabry: Yes Straker: - Phillips - Sussman: - Quentzel: Yes Weiss: - Redwine: Yes Chairman Neuer: Yes Schwarzbaum: Yes APPLICATIONS: 1. ZB-18-06/CLPF — Essex Green, LLC c/o Clarion Partners Carried from 3/7/19 Block: 155.21; Lot: 40: Zone: P-C 495 Prospect Avenue Seeking “d” and “c” variances for the expansion and renovation of an existing Shopping center. EXHIBITS A-1— Aerial map of the site dated 9/12/18 A-2 - Rendering of the Essex Green Shopping Center dated 11/15/18 A-3 — Tree Quantity Analysis dated 12/20/18 A-4 — Site Demolition Plan showing where the trees will be transplanted dated 12/20/18 A-S — Upper Level Leasing Plan dated 10/18/18
File revisions (1)
- Sep 29, 2026
f1bb71975af13,907,801 bytes