Supporting Documentation · Date unavailable
PB-19-04/Prism Capital Partners, LLC
c1fa14cd63d4926da749b9a77838d07777258167c34cb64d89fe5efbc027fbadIndexed text · page 7
Show all pages3. All construction, use and development of the property shall be in conformance with the plans approved herein, all representations of the Applicant and its witnesses during the public hearing, all exhibits introduced by the Applicant, and all terms and conditions of this resolution. 4. The Applicant shall pay all outstanding taxes, application fees, technical review fees, inspection fees and performance guarantees that may be required hereunder. The Applicant shall pay any additional fees or escrow deposits which may be due and owing within thirty (30) days of notification or this approval will be deemed withdrawn. 3. The project will have decorative four feet high aluminum fencing and no chain link fence will be installed. 6. All exterior lights will use LED fixtures. 7. The exterior will not have vinyl siding but will utilize brick, brick veneer, stone or cementitious material and conform to the design requirements of Redevelopment Plan and will be subject to the Board Planner’s final review and approval. 8. The exterior facade of the building shall be in a color or colors subject to the review and approval of the Board Planner and will be consistent and compatible with the Edison complex and the Redevelopment Plan. 9. Applicant to comply with the review letters from John Hess, PE of CME Associates dated September 6 and September 18, 2019 (attached). 10. The applicant will increase the size of the drainage pipe. 11. The applicant will comply with Deputy Chief Steven Hywel, Acting Fire Official’s memorandum dated July 11, 2019 with the sole exception that it may install a NFPA 13R system, rather than a NFPA 13 system. The fire separation wall will extend to the peak of the building. 12. The applicant will work with the Town Forester to add up to five additional trees offsite on Babcock Place subject to the approval of adjacent property owners and feasibility. 13. The applicant will extend the sidewalk on three properties on the North side of Babcock Place, provided the Township can obtain proper permissions from each of the three (3) homeowners and the applicant shall work with the Township Engineer and Forester regarding the alignment of the sidewalk especially where it interferes with the existing trees and roots within R.O.W. 14. There is no direct road access between Phase 2A and Phase 2B of this redevelopment. 15. Phase 2A and 2B will be
alk especially where it interferes with the existing trees and roots within R.O.W. 14. There is no direct road access between Phase 2A and Phase 2B of this redevelopment. 15. Phase 2A and 2B will be part of a single condominium Association as described in the Redevelopment Plan.
File revisions (1)
- Sep 29, 2026
c1fa14cd63d48,068,683 bytes