Minutes · Jun 3, 2020
June 3, 2020
dcc0d9373ae9d6ee5184e62dbba96f5da2aed3860aa9ddefdab2b6817c14d00aIndexed text · page 8
Show all pagesMr. Smeraldo asked if dry fire systems were proposed o Mr. Raker responded that this is not in the plans Mr. Smeraldo asked about striping for fire truck access in drive areas o Mr. Regan responded that the development will be compliant Mr. Trenk asked for the number of affordable units o Mr. Raker responded sixty-four between all buildings Mr. Trenk asked if EV stations will be able to be run to the dog park o. Mr. Raker responded that he is unaware of plans for EV stations at the dog park,; suggested this should be asked of the civil engineer Mr. Wegner inquired if the entire complex would be fully ADA compliant o. Mr. Raker responded in the affirmative Mr. Wegner asked about lighting near the dog park for safety at night; and the recommended amount of seating in seating area o Mr. Raker responded that he is not familiar with dog park nor the seating arrangements Mr. Wilkes inquired about there being only one entrance to each building o Mr. Raker confirmed that there will be only one main public entrance in each building for visitors, but many ways to get in for residents (from garage and amenity area (Building A only) , and other places in the back of all buildings) Ms. Williams asked if anyone can get in to the open garage o Mr. Raker responded in the negative; there is a garage door activated by a resident's fob Chairman Weston requested clarification on the concept of an open garage o Mr. Raker explained that the open parts are cutouts in walls to allow air through Mr. Johnson asked if the buildings are wood frame, what separates each unit (in terms of noise and fire) o Mr. Raker described that there are two walls between each apartment; walls are heavily drywalled with a gap in between to channel sound; there is no sound insulation between walls, but there is between the floor and ceiling Mr. Johnson asked if there will be underground connection between buildings o. Mr. Raker responded in the negative Mr. Johnson asked if the 2br + den layout was still in the plans ©. Mr. Raker responded in the affirmative; adding that there were no 3br layouts
File revisions (1)
- Sep 29, 2026
dcc0d9373ae92,925,263 bytes