Minutes · Jun 3, 2020
June 3, 2020
dcc0d9373ae9d6ee5184e62dbba96f5da2aed3860aa9ddefdab2b6817c14d00aIndexed text · page 9
Show all pagesChairman Weston inquired about trash/recycling and how is it handled o Mr. Raker responded that this is handled from two different areas and through garage at Building A; there will be chutes inside, a compactor, and then through garage to be picked up Chairman Weston asked if there could be a standpipe at both ends of garage since there are no sprinklers; and that this standpipe not be through the doors in Building A, but in the actual garage o Mr. Raker stated that they we will work with WOFFD to provide what is best Chairman Weston inquired if there will be any lighting on face of building; both common and/or fancy o Mr. Raker described the accent lighting at entries, and recessed lighting on balconies; but nothing is planned for the face of the building Mr. Smeraldo asked if the HVAC system can be reversed for smoke clearance reasons o Mr. Raker responded that the HVAC system is not designed yet Mr. Smeraldo asked if there will be stairwell access to roofs o. Mr. Raker responded that there will be where possible Mr. Smeraldo asked if the roofs will be truss construction, and if the trash rooms will have sprinklers o Mr. Raker responded in the affirmative for both Professionals Questions: Mr. Grygiel asked if there will be bicycle storage in buildings B & C o. Mr. Riker responded not currently, but that there is room for them Public Questions: Question was asked by: Kevin Malanga, 57 Ridge Road End of Mr. Raker’s Testimony Mr. Regan introduced the Applicant’s Landscape Architect, Paul Devitto Mr. Devitto provided credentials and was sworn in Testimony covered tree removal and replace plan
File revisions (1)
- Sep 29, 2026
dcc0d9373ae92,925,263 bytes