Minutes · Jul 16, 2020
July 16,2020
1736d5849f5ab8d266b35ee982e366cae78bee99e5b3b45232cfa2f651b17ba5Indexed text · page 4
Show all pagesMr. Martell referred to Exhibit A-1 and detailed it. Mr. Martell presented Plan B of the original plan that was presented, prepared by Stonefield Engineering and dated 7/16/2020, and was marked as Exhibit A-2 for identification. Mr. Martell referred to Exhibit A-2 and detailed it. Mr. Martell stated that this is a full site plan application and he listed all of the plans that were submitted. Mr. Martell presented the rendered site plan that was dated 7/16/2020 and marked as Exhibit A-3 for identification Mr. Martell referred to Exhibit A-3 and detailed it. Mr. Martell stated that the total floor space was reduced, they modified the shape and location of the building, reduced the main roof line and increased the number of parking spaces. Mr. Martell stated that they submitted a tree removal plan with the full inventory of trees and met with the Township Forester. Mr. Martell stat that one story of the building will be below ground, one story at grade and three stories above that. He said the entrance is on the first level. Mr. Martell detailed the building entrances and the trash enclosure location which is only for household trash. He said that there will not be a dumpster for those who rent the units. Mr. Martell detailed the access driveways stating that they were designed for box, fire and delivery trucks. Mr. Martell stated that they are proposing an underground detention basin and all new utilities. He stated that lighting will be contained at the front of the building and that there will not be any lighting on the sides or rear base of the building. Mr. Martell detailed the location of the lights and stated that there will not be any light spillage on any of the adjacent residential properties; he said they are proposing all LED down spill light fixtures. Mr. Martell stated that they are proposing to install swales that will be directed to the catch basins and into the County storm water basins. He said that all storm water will be collected into the County system. Mr. Martell detailed the lot area of the two lots and the impervious coverage.
File revisions (1)
- Sep 29, 2026
1736d5849f5a2,586,807 bytes