Agenda · May 20, 2021
May 20, 2021 Regular Meeting
888b2390cbc736341ff00cf5d48ef674423c25542ae38028f85038f8d546372dIndexed text
1 AGENDA TOWNSHIP OF WEST ORANGE ZONING BOARD OF ADJUSTMENT MEETING May 20, 2021 8:00 P.M. Will be held virtually Please click the link below (or copy and paste into your browser) to join the meeting: https://us02web.zoom.us/j/82447676234?pwd=dTlIN2VKNnF6SUFjVGZhQzlXdng2dz09 Or Telephone: Dial: US: 1-646-558-8656 Webinar ID: 824 4767 6234 Password: 980265 A. NOTICE Notice of this meeting was given to the Township Clerk, the West Orange Chronicle and the Star Ledger, and posted on the Township Bulletin Board in accordance with the “Senator Byron M. Baer Open Public Meetings Act.” B. PLEDGE OF ALLEGIANCE C. OPENING STATEMENT D. ROLL CALL Jerome Eben, Philip D. Neuer, Bart Quentzel, Jonathan Redwine, Peter Ricci, Irv Schwarzbaum, William Steinhart, Dr. Michael Straker, M. Sussman, Alice Weiss E. ANNOUNCEMENTS Meetings: June 10, 2021 (Special Meeting) June 17, 2021 (regular) July 15, 2021 (regular) August 19, 2021 (regular) F. SWEARING IN Township Professional(s)
2 G. RESOLUTIONS 1) ZB-21-02/Santiago Approved 4/15/2021 Block: 85.06; Lot:2; Zone: R-5 205 Mt. Pleasant Avenue. “C” Side Yard Variance to replace front and side decks with a wraparound porch. Changes to Original Variance Request H. APPLICATIONS 1. 1. ZB -19-10/955 Pleasant Valley Way, LLC Carried from 3/29/2021 Block: 172.02; Lots: 8.01 & 8.03; Zone B-2 955 & 963 Pleasant Valley Way Seeking “d” use and height variances and “c” variances and preliminary and final major site plan approval to construct a four (4) story self-storage facility. Executed Application Site Plans Stormwater Report Traffic Assessment Letter Report Parking Memorandum West Orange Cover Sheet Basement Plans First Floor Plans Second & Third Floor Plans Fourth Floor Plans Elevations Applicant's Professional Planners Report Revised Cover Sheet Revised Elevation Plan Revised Lower Cellar Plan Revised Office Plan Revised Roof Plan Revised Third Floor Plan Revised Upper Cellar Plan Site Plans Actual Revised 1st & 2nd Floor Plans Planning Directors Memo REVISED Township Forester Review Township Consulting Engineer Review Memo
3 Ariel Exhibit Colorized Site Plan Exhibit Mean Grade Exhibit Site Plans REV 2 Exhibit Steep Slopes Plan Exhibit Street View From Above Exhibit East Above REVISED Exhibit Sustainability Checklist Exhibit Traffic Parking Assessment Letter Environmental Status of Former Gas Station Site Section Exhibit Solid Waste Management Statement Revised Site Plan 3 Truck Turning Exhibit Consulting Engineer’s Review Memo #2 Operations Presentation Exhibit Supplemental Report from Township Planner Foundation Retaining Wall Exhibit Building Height Calculation Narrative Environmental Noise Analysis Cover Letter Revised Submission Parking Memorandum Purchase Sale Agreement Traffic Assessment Revised Earthwork Exhibit Indemnification Access Agreement GEO Tech Report Revised Landscape Plan Environmental Report Township Fire Officials Review Memo Review Memo from the WO Police Traffic Division Operations-Presentation-Exhibit Revised-Foundation-Retaining-Wall-Exhibit Rental-Slide Parking-Memorandum--revised--11-4-2020 Earthwork Exhibit 2 11-4-2020 Response Letter to CME memo 11-4-2020 Revised Site Plan 11-3-2020
4 Traffic Assessment revised 11-4-2020 Sight Distance Exhibit revised 11-4-2020 Stormwater Mgmt--Report-11-4-2020 Stormwater-OM-Manual-11-4-2020 Consulting Engineer Review Memo #3 Revised Architectural- Plans 11-12-2020 Planning Director's Memo November 2020 Site Rendering Exhibit 11/18/2020 Architectural Rendering of Proposed Building Exhibit 11/18/2020 Section Rendering Exhibit 11/18/2020 Revised 1st & 2nd Floor Plans Sheet A Revised Architectural Cover Sheet Revised Architectural Plans A 20 Upper Cellar Revised Roof Plan Sheet A50 Revised Sheet A30 and 2nd Plans Sheet A31 Revised Planners Report 1/11/2021 Revised Sheet A10 Lower Cellar Plan Revised Sheet A40 Elevations Revised Site Plan 1/11/2021 Township Planner's Report Final 1/2021 Section Rendering Exhibit Revised Site Rendering Exhibit Revised Operations Presentation Jan 2021 Supply and Demand Study 4 Township Engineers Review Memo Colored Rendering of Storage Unit Facility Video - First Pass.mp4 - Google Drive Enscape Roof Plan West Orange Storage Unit Imagery Site Plan Cover Letter Revised Submission 5/7/2021 West Orange City Submittal 5/6/2021 Stormwater Report Section Rendering Site Rendering
5 2. ZB 21-06 / Rawls Block: 176.02; Lot: 7 7 Marmon Terrace Seeking 2 C2 Variances Variance Application Variance Paperwork Property Survey Variance 1 Variance 2 Variance 3 Variance 4 Variance 5 Variance 7 Planning Director's Memo Google Photos 2. ZB 21-05 / Tamay Block: 125.02; Lot: 100 60 Cherry Street Seeking a C1 Variance with an exceptional situation. Planning Director's Memo 60 Cherry Street Documents Planning Director's Memo I. ADJOURNMENT
File revisions (1)
- Sep 29, 2026
888b2390cbc7485,490 bytes