Minutes · Apr 15, 2021
April 15, 2021 Regular Meeting
9765c9added7ba21b5380fecdd3221a688993bd8e28126ff36f18d9d68e4d680Indexed text · page 4
Show all pages2) ZB-21-03/Ice Block: 148.04; Lot: 5; Zone: R-6 37 Moore Terrace Seeking a “c” variance for the side yard setback for installing a mini split air condenser on the side of house Motion: I. Schwarzbaum Second: J. Eben Approved on 3/18/2021 ADOPTED Eben: Y Straker (Alt.4): ABSENT Quentzel (Alt. 1): Y Sussman (Alt. 3): NA Redwine: Y Weiss: a Ricci: Y Chairman Neuer: Y Schwarzbaum: Y Yes: 7 unable to vote: 3 Steinhart: ABSENT APPLICATIONS 1) ZB-20-14/E&J Masonry Supply Inc. Block: 2; Lot: 43.01 & 50; Zone: R-T 15-19 Meeker Street Seeking a “d” and “c” variances major site plan approval. Presentation: - Mr. Schkolnick (applicant’s attorney) detailed the application to the board. The goal is to bring the commercial aspects of the property substantially inside an expanded structure by raising the roof of building and making it so trucks and other vehicles can navigate inside which also addresses NJDEP issues by raising the Ist floor elevation to move the operations out of the floodplain. With the site being directly adjacent to the East Branch of the Rahway River, the current submission addresses most of the technical issues. -There is one minor glitch with the architectural drawings. The filed plans show two first floors. Mr. Grygiel pointed this out in his February 11, 2021 review letter. The 2nd floor of what is proposed is slightly different than what is in front of the Board.
File revisions (1)
- Sep 29, 2026
9765c9added73,359,469 bytes