Minutes · May 5, 2021
May 5, 2021 Adopted Planning Board Minutes
27d452bee3341b066924d4fa3a05177b57d80c686c319f022524d76cc29bad97Indexed text · page 6
Show all pagesbuilding to the second resident entrance that leads you to this stair Carter, where there are 12 apartments. The North side is the primary main entrance. There is another door connecting leading to the South yard. And that is there so residents can take their trash out and bring it and put it in the trash cans that were previously discussed just to the left of the building that will be enclosed by the fence along the front and the left side or the South side of the property. -In regards to the elevations and facade materials which are indicative of the elevations on all four sides of the building. The building consists of brick around the base of the building with horizontal siding, single hung windows, all very residential in design with a sloped roof and asphalt shingles. From the front entrance, there are two steps up, as well as an ADA compliant ramp to the front door which forms a small covered front porch. On the North or East side of the residence is the 2nd entrance shown which once again is a covered entrance for the residents to utilize. Both entrances will be ADA compliant. There will be 188 fully accessible unit in the building on the Ist floor. - Ms. Johannesen confirmed that all residents’ belongings will all be contained within their apartments. Theh went through the sustainability checklist and the commitments that making to make this building sustainable. Sustainability features include Energy Star labeled kitchen appliances, windows and bathroom exhaust fans. Watersense plumbing fixtures will be utilized for the toilets, sittk faucets, the showers and the kitchen faucets. Applicant is providing green and recycled content materials consisting of hatdwood or engineered hardwood flooring, porcelain tile in the high ttaffic areas. Cabinets and counters tops that do not contain any formaldehyde. LED lighting throughout. Occupancy sensors on the lighting so that when a spaces are not occupied, the lights will be lower or off. There will, even though this is a very small construction project, there will be 4 waste management plan specified for recycling of construction debris during constructioh that will reuse or salvage any suitable materials to divert construction waste from the landfills. Then touched upon the sloped roof with an asphalt shingle specified as a 30 year architectural grade shingle which will need little to no maintenance. -In
ivert construction waste from the landfills. Then touched upon the sloped roof with an asphalt shingle specified as a 30 year architectural grade shingle which will need little to no maintenance. -In regards to sighage, Ms. Johannesen explained that there are no signs proposed, however a street address nutnber will be provided so that for emergency services the building can be identified. BOARD QUESTIONS -Chairman Bagoff asked, where the mailboxes will be. Ms. Johannesen answered that the mailboxes are in a kiosk in the front yard. Chairman followed up by asking if any of the water runoff can be used to water the gardens and the trees that are there is impossible. Ms. Johannesen responded that they would be agreeable to looking at providing like a rain barrel at one of the OR multiple sites. But she couldn't comment on the volume of a downspout, so that can be harvested and then utilized for watering onsite.
File revisions (1)
- Sep 29, 2026
27d452bee3345,138,980 bytes