Minutes · Dec 7, 2011
December 7, 2011
fa73f42e9097104d14c0eefa1319e907b4d3514026420c0edbc9dd8ea5e9c94bIndexed text · page 5
Show all pagesChairman Bagoff called for a five-minute recess at 9:12 P.M. Chairman Bagoff reconvened the meeting at 9:17 P.M. Mr. Dwyer said that the ordinance includes basement square footage for parking calculations and must be included in the application, and the revised increased total square footage required a parking variance. The Board calculated that a C2 variance for 22 parking spaces was needed. The Board discussed how many employees could potentially be on the second floor and if it was necessary to have an additional second floor exit. The Board decided that the Building Department would determine if an additional second floor exit was necessary. Chairman Bagoff stated that the Applicant would agree to all requirements set forth in Director Lepore’s Engineer’s Report: ¢ The plan to include more information indicating how the rear of the property behind the parking lot and the southerly portion of the property next to the proposed one story addition will be graded and landscaped; e To climinate any increase in peak rates of runoff and the need for storm water detention, the impervious area shall not change from current levels; The plan shall indicate how roof runoff will be disposed; All deteriorated curb and pavement will need to be repaired or replaced; Al lighting plan with foot-candle levels shall be submitted; The number of parking spaces shall be based on the gross square footage of the building. The number of handicap accessible parking spaces to be determined by the Barrier Free Sub code of the New Jersey Uniform Construction Code; The plan to indicate left turns are prohibited out of driveway; The plan to indicate the grease trap will remain and there will be no building flow from non-restaurant areas; The building additions are subject to the Township’s supplemental sewer fee; An enclosure is required for trash and recycling receptacles; A tree removal permit is required if applicable; Details are required for curb, pavement, sidewalk and lighting. The Board agreed that all revised plans were to be submitted no later than December 23, 2011, ten days before the January 4, 2012 Planning Board meeting. Conditions: 1. Applicant to provide revised lightning plan including type of fixture; height and illuminations; Applicant to provide all-roof drainage plan; Applicant to submit a basement plan; The basement to be used exclusively
ide revised lightning plan including type of fixture; height and illuminations; Applicant to provide all-roof drainage plan; Applicant to submit a basement plan; The basement to be used exclusively for storage and mechanical equipment; The grease trap will not be removed; it will be used for kitchen drainage only; All HVAC equipment to be located on the roof and hidden from view; AARYN N:\PLANNING. BRD\WP\MINUTES\2011\12-7-11 Minutes.doc 5
File revisions (1)
- Sep 29, 2026
fa73f42e9097223,767 bytes