Show all pagesMs. Gornelli’s testimony concluded. Presentation Mr. Charles Dietz, Architect for the Applicant was sworn under oath and confirmed that he was qualified as an expert in the filed of architecture at the October 28, 2021 meeting. Mr. Dietz testified in regards to the building design. There are now 951 units where originally there were originally 1.059. Mr. Dietz testified further stating that the proposed building is going to be built with energy compliant materials which will exceed the minimum standards. (i.e., a white roof to reflect roof to help with energy efficiency) Mr. Dietz further testified stating that given the height of the building with an exterior having a split base and small signage; the site line prospective view won’t see “stick out” like the Verizon towers next door which is part of the December 6, 2021 submission. Mr. Dietz explained based on the Geotechnical Report that the southwestern portion does not encroach. The method of removal is going to be by chipping with no blasting. The reductions are approved and an improvement. Board Questions Chairman Neuer asked in reference to the existing footprint from Architectural viewpoint can this be a two (2) story building. Mr. Dietz said that PS Atlantic Coast LLC told him that it requires it to be three (3) stories, but yes, it is capable for this footprint. If building becomes two (2) stories it would be reduced by a third and financially not worth it based on his information received by PS Atlantic Coast, LLC. Chairman Neuer asked if there was a consideration for solar panels to be installed on the roof. Mr. Dietz said that it’s a possibility. P. Ricci asked what is located on the southwestern corner of the roof. Mr. Dietz said that it is a roof hatch for maintenance to get and utilize the roof. P. Ricci said overrun. Mr. Dietz said that it was for elevator but below the parapet. P. Ricci asked what the exterior height of the building will be. Mr. Dietz said building will be nine (9) or ten (10) feet high. P. Ricci asked what kind of stucco is being used. Mr. Dietz said that it is an over metal stucco. P. Ricci asked what kind of entrance element will be there. Mr. Dietz said that it will be nine (9) or ten (10) feet high with an option for stucco plaster. P. Ricci asked if there is a possibility for the orange in the design to be eliminated. Mr. Dietz said that it is a
d that it will be nine (9) or ten (10) feet high with an option for stucco plaster. P. Ricci asked if there is a possibility for the orange in the design to be eliminated. Mr. Dietz said that it is a possibility and it has been discussed.
File revisions (1)
- Sep 29, 2026
c98e8be8c3883,490,964 bytes