Town CrierWest Orange, New Jersey
← Back to search

Minutes · Jan 20, 2022

January 20, 2022 Regular Meeting

Preserved file SHA-25694eb085e61bc95d7c7756561ad7b80fc7654338166309d12b4aa84a6c195a944

Indexed text · page 8

Show all pages
Page 8

answered in the affirmative. Mr. Kreigher asked if these materials will be of the hazardous nature. To which Mr. Guallpa answered in the negative stating that asbestos for example has to be removed by someone with a license. E&J Masonry does not have this license. e = Mr. Charles and Mrs. Darlene Plavescky (24 Central Place) asked how they can enforce parking. Chairman Neuer answered that questions of this nature should be brought up to Code Enforcement and or the West Orange Police Department. Mr. Plavesky asked how many trucks are inside and if any are lift trucks. Mr. Guallpa said there are six trucks and no lift trucks. ¢ Application ZB 20-14 E&J Masonry is carried to the February 17, 2022 Regular Meeting with no further notice required. 2. ZB-21-08/Main West Orange LLC (Carried from 11/18/2021) Block: 116; Lot:53, 53.01 & 55; Zone: B-1 &R-T 257-259 Main Street Seeking site plan approval with “d” variance to convert existing 2 attached buildings which vary in height into one 4 story building. © Application ZB 21-08 Main West Orange LLC. is carried to the February 17, 2022 Regular Meeting with no further notice required. BREAK 9:30-9:35PM 3. ZB-20-16/PS Atlantic Coast, LLC (Carried from 10/28/2021 Meeting) 424 Eagle Rock Avenue Block: 111; Lot: 1.08; Zone: B-2 Prelim. & Final Site Plan Approval w/variances to construct a storage unit facility Presentation e Ms. Lisa John Basta Esq. entered on the record and summarized previous testimony from the September 9, 2021, October 28, 2021, and December 16, 2021 meetings. She then confirmed that there is no license agreement from flag portion of the lot. e Ms. Gabrielle Gornelli Engineer for the Applicant was sworn under oath, credentials were given and was accepted as a professional in the field of Engineering. ¢ EHIBIT A3 Colorized Site Plan (Revision Date of January 7, 2022) e Primary design change is striping on Eastern side; any technical change is to reflect Mr. Hess’ letter. e Including lighting levels from L701 and night time light level study done which is consistent to what is proposed.

File revisions (1)