Minutes · Apr 4, 2012
April 4, 2012
085f826ee7bbb0f625017a89aae111f63419ff893c0a64f1c670a02a57325528Indexed text · page 8
Show all pageswould leave a portion of the existing chain-link fence and mix it with new fencing. Belony Guard, 9 Wilfred Street, Montclair, was sworn in. Mr. Guard identified himself as the current tenant of the property. Mr. Guard wanted to know when the new store would be built. Mr. De Vecchio said no date has yet been determined. Elizabeth Husarra, 14 Frances Road, Lincoln Park, was sworn in. Ms. Husarra identified herself as the leasing agent for the property located at 2 Central Avenue. Ms. Husarra said that she did not understand why this Application was allowed because the Applicant had no ties to the community and would negativity affect long-standing businesses in the area. Mr. Del Vecchio objected to Ms. Husarra commenting because she was not the property owner. Chairman Bagoff explained the Application procedure to Ms. Husarra. He said that the law allowed any Applicant to meet before the Planning Board; in this instance, the Applicant was the 7-Eleven Corporation. The Public had no further questions for Mr. Freud. Thomas Heigle, AIA, Harrison French & Associates, Lid., was sworn in, stated his credentials; and accepted to be an expert witness in the field of architectural design. Before Mr. Heigle presented his testimony, Mr. Eben stated the architect’s Title Block must be in accordance with the Statues and Regulations of the NJ Board of Architect law 13:27- 6.7, Chairman Bagoff said the final plans must have the correction. Mr. Del Vecchio said the error was duly noted and would be corrected. Mr. Heigle described the proposed building structure and materials, The exterior would be red buff brick, the actual color shade was truer in the color rendering on Exhibit A-8. Mr. Heigle said the design of the building was similar to look of the newer 7-Eleven stores. The design would have cornice crown molding painted beige; green fabric awnings with steel frame, beige sandstone base cements panels; continuous LED cove lighting at front and sides of building, and building signage would include harbinger sign above entrance and illuminated cabinet panel signs located above the right and lefi side of the entrance. Parapets would screen the mechanical units on the roof. The entrance door would not be power- operated; it was not an ADA requirement for this type of structure. Mr. Heigle concluded his testimony. Chairman Bagoff asked the Board if they had any
the roof. The entrance door would not be power- operated; it was not an ADA requirement for this type of structure. Mr. Heigle concluded his testimony. Chairman Bagoff asked the Board if they had any questions for Mr. Heigle. The Board and Mr. Heigle discussed the need for a canopy above fire exit door; whether gteen standards were considered in the design of the building; sustainability and heat island effect; what color was planned for the roof, Mr. Heller said the lighter the color, the better for the environment. Mr, Weston asked if the Applicant would consider a lighter roof color as a condition of approval. Mr. Del Vecchio said it would be considered if it would not be a significant cost factor. The Board and Mr. Heigle discussed clarification of the exterior materials to be used in construction of the building, and the height of the building. Director Lepore, Director Borg, the Public Advocate, and members of the Public had no questions for Mr. Heigle. NAPLANNING. BRDiWP\MINUTES|20124-4-2012 Revised Draft Minutes.doe a
File revisions (1)
- Sep 29, 2026
085f826ee7bb412,461 bytes