Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Date unavailable

PB 22-04 IMMC993, LLC - Block: 172.02 Lot: 6

Preserved file SHA-256ae4e7d89f5b3e10cd59f47100e21f07de325e34a77f1caead5a24e0e587f689e

Indexed text · page 7

Show all pages
Page 7

28. 29. 30. Si, 32. 33! 34. 35. 36. 37. 38. 39. 40. A fire truck turning template shall be supplied by Applicant. Applicant will install curbs as per the memorandum of John J. Hess, Planning Board Engineer dated July 5, 2022, comment 8. . An electric vehicle parking space sign to be added to the plans as per the memorandum of John J. Hess, Planning Board Engineer dated July 5, 2022, Design Comment # 23. Electric vehicle parking space to be installed in compliance with State Law. . As per the memorandum of John J. Hess, Planning Board Engineer dated July 5, 2022, Design Comment #11, a bollard at the Northwest corner must be added to the plans. As per the memorandum of John J. Hess, Planning Board Engineer dated July 5, 2022, Design Comment #12, the details of the proposed retaining walls must be added to the plans. As per the memorandum of John J. Hess, Planning Board Engineer dated July 5, 2022, Design Comment #13, wheel stops should be labeled, and a wheel stop detail added to the plans. As per the memorandum of John J. Hess, Planning Board Engineer dated July 5, 2022, Design Comment #15, sheet A-5 must be revised to clearly identify the limits of the proposed concrete curb. As per the memorandum of John J. Hess, Planning Board Engineer dated July 5, 2022, Design Comment #16, existing and proposed improvements must be clearly labeled on sheets A-4 and A-5. As per the memorandum of John J. Hess, Planning Board Engineer dated July 5, 2022, Design Comment #18, Applicant must show the parking lot lights on Sheet A-4 and demonstrate that the parking lot lighting complies with the requirements of Section 25- 14 of the Land Use Regulations. As per the memorandum of John J. Hess, Planning Board Engineer dated July 5, 2022, Design Comment #19, a detail of the proposed bollard lights must be added to the plans (As noted on sheet A-6). If a site identification sign is proposed then the location must be shown on sheet A-4 and a detail provided (As per the memorandum of John J. Hess, Planning Board Engineer dated July 5, 2022, Design Comment #21) Details of the proposed pavement markings must be added to the plans as per the memorandum of John J. Hess, Planning Board Engineer dated July 5, 2022, Design Comment #22. The undersigned secretary certifies the decision set forth herein was made by this Board on July 6, 2022 and memorialized herein

Page 7

Hess, Planning Board Engineer dated July 5, 2022, Design Comment #22. The undersigned secretary certifies the decision set forth herein was made by this Board on July 6, 2022 and memorialized herein pursuant to N.J.S.A. 40:55D-10(g) on August 3,2022.

File revisions (1)