Supporting Documentation · Date unavailable
PB 22-05 West Orange Public Schools/289 Main Street - Block: 125.01 Lot 40
665a075c9ca16fd2734b5b90ac5eb96eff85485b142b9d5eca185f6bc507ccbaIndexed text · page 3
Show all pages5. The means of ingress to the TCU on the school side of the TCU will be a ramp and there is a second means of ingress/egress from the rear of each classroom. 6. The lease for the TCU is three (3) years and can be extended once the Board of Education has completed its enrollment study for projected enrollment. 7. The TCU will have fire alarms and sprinklers and an ambulance will have direct access to drive up to the TCU. 8. The dumpsters which are currently located where the TCU will be moved to the northern end of the retaining wall. 9. The placement of the TCU.was determined to be the best location because there are requirements as to minimum distance from a building that the TCU can be placed, there is a manhole on the asphalt that could not be covered, and parts of the area are sloped. 10. The Township Planner, Paul Grygiel, testified that he is satisfied with the plan as presented. 11. The project meets the goals of the Master Plan as it fulfills the goals and objectives including, that there is a pressing need for additional classroom space while the West Orange Public Schools determines enrollment. NOW THEREFORE be it resolved by the Planning Board of the Township of West Orange that the District’s school facilities project for the replacement of a retaining wall and installation of a Temporary Classroom Unit (TCU) for property located at 289 Main Street, is not inconsistent with the Township Master Plan. AND IT IS FURTHER RESOLVED that the Planning Board makes the following recommendations regarding the school facilities project: 1. The District shall comply with all applicable Township, County, State and Federal laws, ordinances, regulations and directives, including without limitation, obtaining all applicable local, state and federal approvals and/or permits. 2. In the event that any other required regulatory approval conflicts with the terms and conditions hereof, or materially alters the same, or the terms and conditions hereof are materially altered by any change in applicable law or regulation other than those municipal regulations for which change is prohibited by the Municipal Land Use Law (MLUL), or in the event District or its successor or assigns construct or attempt to construct any improvement in conflict with or in violation of the terms of this review, the Board hereby reserves the right to withdraw, amend or supplant the
cessor or assigns construct or attempt to construct any improvement in conflict with or in violation of the terms of this review, the Board hereby reserves the right to withdraw, amend or supplant the instant review and recommendations. 3. Allconstruction, use and development of the property shall be in conformance with the plans reviewed herein, all representations of the District and its witnesses during the public hearing, all exhibits introduced by the District, and all terms and conditions of this resolution.
File revisions (1)
- Sep 29, 2026
665a075c9ca12,002,680 bytes