Town CrierWest Orange, New Jersey
← Back to search

Agenda · Jan 19, 2023

January 19, 2023 Regular Meeting

Preserved file SHA-2564ef6e4f77af5241335dd1bd1b8b77212d6f4a6065e390948516e8fbc90eb2c2e

Indexed text · page 2

Show all pages
Page 2

F. ANNUAL REPORT G. SWEARING IN Township Professional(s). H. RESOLUTIONS ZB-22-09 89 Ashland Avenue LLC (87-89 Ashland Avenue) (Approved 12/15/22) Block: 61; Lot: 44 & 45; Zone: I Seeking Preliminary and Final Site Plan Approval with “c” and “d” variances to construct building addition to accommodate two additional dwelling units was approved with conditions at the December 15, 2022 Regular Meeting. I. APPLICATIONS 1.) ZB 21-01 M Vega Investments LLC/66 Franklin Avenue (Carried from 10/20/2022) 66 Franklin Avenue Block: 134.02; Lot: 75.03, 79, 81; Zone: B-1 Seeking “c” and “d” variances for modifications to property with mix of uses. Application & Original Submission (w Planning Report Dated 12-22-2020) Property Survey (Dated June 28, 2021) Traffic Assessment Report (Dated September 24, 2021) Preliminary & Final Site Plan Set 9/24/2021 SPRAB Report (Dated February 9, 2021) West Orange Planning Board (Site Plan Submission (Dated - September 20, 2021) Planning Director's Memo (Dated November 24, 2021) Traffic and Parking Assessment Report Cover Letter Traffic and Parking Assessment Report Revised 12/3/2021 Zoning Board Engineer Review #1 (Dated 12-8-2021) Preliminary/Final Major Site Plan (Dated - January 7, 2022) Stormwater Management Statement (Dated January 7, 2022) Summary of Approvals and Permits (Dated-January 6, 2022) Summary of Requested Relief (Dated- January 6, 2022) Cover Later (Dated January 7, 2022) Town Engineer- Review #2 (Dated- January, 18, 2022) Planning Director Memo (Updated January 28, 2022) Consent to Continuance Dated 2/14/2022 Consent to Continuance 4/19/2022 Cover Letter Dated 6/13/2022 Ariel Exhibit Dated 2/15/2022 (Submitted 6/13/2022) Rendered Site Plan Exhibit Dated 1/14/2022 (Submitted 6/13/2022) Cover Letter Site Plan Set Architectural Plans Hardcopies in RUT Planning Director memo ZB21-01 M Vega Investments LLC updated 8/8/2022 CME Engineering – Review #3 (Dated 8-10-2022) Signature Block Change Submission from Architect- Letter Dated 8/15/2022 Truck Turn Exhibit (Submitted 8-18-2022) J. Hess Response to Truck Turn Exhibit Dated 8/18/2022 8/29/2022- S. Hywell Email re: Truck Turn Exhibit Cover Letter

File revisions (1)