Supporting Documentation · Date unavailable
PB-23-08 The Library of New Jersey Block: 120.01 Lots: 24 & 26
79c04f66f8298657bbfcd1ae1ddefe890066fcba5cafc00a2a3f88e209aa27d0Indexed text · page 10
Show all pages11. 12. 14. The Applicant shall list all conditions of approval onto a final site plan submission prior to the submission of the building permit. Applicant shall install a generator with the approval of the Township Engineer and Zoning Official as to its location. Said generator must be included on the site plan and noise data for that generator shall be submitted to the Township Engineer and Zoning Official to demonstrate that the generator will comply with all applicable state and local noise codes. Applicant shall provide all necessary design specifications for such a generator within 30-days of the issuance of a certificate of occupancy, and the installation of such a generator shall not be a condition of zoning compliance or occupancy; however, a generator shall be installed within 90-days of the issuance of a certificate of occupancy. Applicant will provide construction details for all the proposed site improvements. Applicant will provide a lighting plan. The Applicant must demonstrate that the lighting in the rear parking lot will comply with the Township Ordinance requirements regarding minimum lighting levels and the spillage of light onto adjoining properties or right of way. Security cameras must be operational twenty-four hours a day, seven days a week. Applicant will supply security video if requested by West Orange Police Department, Orange Police Department, or other police department without need for a subpoena. The debris located in the rear of the building will be cleaned up by appropriate means, including removal of any hazardous or environmentally sensitive materials that are left at the site.
File revisions (1)
- Sep 29, 2026
79c04f66f8295,356,253 bytes