Supporting Documentation · Date unavailable
PB-21-01 West Orange Plaza Block: 152.01 Lot 1445 & 1445.05
a07e1ca30cd2289fa087da1b1de153bce05680b085f4a4210048a6f2a8df608bIndexed text · page 24
Show all pages4. All construction, use and development of the property shall be in conformance with the plans approved herein, all representations of the Applicant and its witnesses during the public hearing, all exhibits introduced by the Applicant, and all terms and conditions of this resolution. 5. The Applicant shall pay all outstanding taxes, tax liens, application fees and technical review fees, as well as any inspection fees that may be required hereunder. The Applicant shall pay any additional fees or escrow deposits which may be due and owing within thirty (30) days of the notification or this approval shall be deemed withdrawn. 6. All notes included in the approved plans, including notes required by this Resolution, shall be deemed conditions of approval having the same force and effect as conditions expressly set forth in this Resolution. 7. New sidewalks along Building C as suggested by Township Engineer will be installed as shown on the revised site plan exhibit. 8. A “Left turn only” sign shall be installed at the Suite D-3 drive thru lane as recommended by the Township Engineer in his report dated June 7, 2023 and as shown on the revised site plan exhibit. 9. Applicant will comply with all of the recommendations set forth by the Township Engineer in his report of June 7, 2023 with the exception of: #6- EV spaces will be installed as per State statute (In three phases), #10- already provided on the plans, and #14 relating to the Stormwater Maintenance Manual as it was already provided. 10. A note regarding the 0.3 footcandles for light poles to be added to plans. 11. Striping to be added to pavement in the rear of the Main Building to show fire lanes.
File revisions (1)
- Sep 29, 2026
a07e1ca30cd27,545,357 bytes