Supporting Documentation · Date unavailable
PB-24-03 Crystal Eagle LLC - B: 111 L: 108 Z B-2
6e445c7d1818529bcc73d7e56030c76a4acab900d003f72ecba5f4ba4b598b05Indexed text · page 8
Show all pagesBuilding), the Applicant provided sufficient proofs that exceptions should be granted and the Board finds that conditions agreed to by the Applicant will alleviate or reduce any negative effects of the exceptions. 6. A waiver from submitting the Sustainability Checklist and for the requirement that Applicant submit a signed and sealed copy of the survey of the property is granted as these items are not relevant due to the very limited scope of the work and are not relevant to the proposed project. NOW THEREFORE be it resolved by the Planning Board of the Township of West Orange minor site plan approval and variance relief for maximum lot coverage and maximum parking row length without landscaped island is granted. AND IT IS FURTHER RESOLVED that the above approval is subject to the following terms and conditions: 1. The Applicant shall comply with all applicable Township, County, State and Federal laws, ordinances, regulations and directives, including without limitation, obtaining all applicable local, state and federal approvals and/or permits. Without limitation of the foregoing, prior to the signing of the approved site plans, and prior to the commencement of any land disturbance or construction but excluding interior renovations, the Applicant shall submit to this Board, with a copy to the Board Engineer, proof that it has obtained all required governmental approvals. 2. In the event that any other required regulatory approval conflicts with the terms and conditions hereof, or materially alters the same, or the terms and conditions hereof are materially altered by any change in applicable law or regulation other than those {Cyrstal Eagle Draft Resolution}
File revisions (1)
- Sep 29, 2026
6e445c7d18184,863,891 bytes