Town CrierWest Orange, New Jersey
← Back to search

Minutes · May 1, 2024

May 1, 2024 Planning Board Regular Meeting Minutes

Preserved file SHA-256221722bc0b629f333c408f0d0e6f30b9c124f3fbaffbd35011b8926ca9355064

Indexed text · page 8

Show all pages
Page 8

Crystal Lake. Mr. Couvrette think there is no access design or proposed other than the fact that there's no curbing. Mr. Alpert asked if it is possible to expand the size of the planting areas in the parking lot. Mr. Couvrette said that landscaped areas in the parking lot was configured to get those 170 spaces. Mr. Klein asked why they are not proposing loading spaces. Mr. Couvrette said that certain uses don't require a loading space in the ordinance that's why it’s not being proposed. Mr. Cardoza asked is there potential to do any type of signage or striping to slow pedestrians. Mr. Couvrette said that they will comply. Ms. Kapferer asked if the curb that’s being proposed would kind of direct all of the runoff from the neighboring property toward the street. Mr. Couvrette answered in the affirmative. Chairman Bagoff asked if they can add traffic calming devices on the stand. Mr. Couvrette said they will add 2 humps on the road to prevent speeding. Chairman Bagoff asked if they would be able to put up some type of greenery evergreens that would prevent people from walking through as opposed to a fence. Mr. Couvrette said they will add more trees at the back of the property. PROFESSIONALS QUESTIONS Mr. Haizel asked what is the required maximum lot coverage. Mr. Couvrette said it is 50%. NOPUBLIC QUESTIONS PRESENTATION The architect, Mr. Matthew Jarmel, entered on the record, he was sworn under oath and his credentials were accepted by the board. He testified to the following: He presented drawing SD 101 which depicts the floor plan of the building and some proposed changes. The building is a vacant bowling alley. The building has a flat roof. The current entry to the building is just off center. It's not handicapped accessible currently. They have depicted the building showing potentially 2 tenants that will have two separate entries. They are creating new glass storefronts on the edges. They are proposing an ADA compliant ramp. Drawing SD102, shows the proposed elevations. They are proposing to construct a new parapet that matches the existing on the right side or the southwestern fagade which would probably be a metal panel system and it would hide any mechanical equipment presumably when the building is renovated. It's going to receive new HVAC equipment. The intent is to modernize that equipment making it energy efficient and meet or

Page 8

uld hide any mechanical equipment presumably when the building is renovated. It's going to receive new HVAC equipment. The intent is to modernize that equipment making it energy efficient and meet or exceed current energy codes. If they decide to use solar panels it would require major structural modification. The roof would need to be structurally reinforced. There's an existing bowling sign that they are proposing to keep and maintain. There's an existing pylon sign up on Eagle Rock Avenue; they are proposing to reface the sign and make it available for tenants that will be moving into the building it's

File revisions (1)