Town CrierWest Orange, New Jersey
← Back to search

Agenda · Feb 12, 2025

February 12, 2025 Planning Board Special Meeting

Preserved file SHA-2565ff08f303f094a9cd4b51255e4c8d32d7a27dc23cb262affb67bd164667219c5

Indexed text · page 2

Show all pages
Page 2

• The next Planning Board regular meeting will be held March 12, 2025 at 7:30 P.M via Zoom. D. ROLL CALL E. MINUTES & RESOLUTIONS • PB-20-03-Alpert-Group-Extension-of-Time-Resolution-3-6-2024 F. SWEARING IN • The Township Professional(s) sworn in. G. APPLICATIONS • PB-24-19 TheWayMaker LLC Block: 106 Lot: 20.03 Zone: R-1 40 Eagle Ridge Way The applicant, TheWayMaker, LLC, proposes to undertake site work on a lot with an existing one-family dwelling. The proposed site work includes the installation of a subsurface chamber infiltration basin in the rear yard, as an enhancement to a previously approved stormwater seepage pit detention system. 23-1345-008---PB-24-19---40-Eagle-Ridge-Way---Engineering-Review 40-Eagle-Ridge-Way---West-Orange---Planner-Report 40-EagleRidge-Way-Board Attorney Letter 210210_Roberts-Topographical-Survey 230310---40-Eagle-Ridge-Way---West-Orange----FINAL-SURVEY 14078/240916_40-ERW-Stormwater-Report-FULL 240917_40-ERW-Full-Civil-Set Noticing-Documents THEWAYMAKER-200-FOOT-LIST-AND-UTILITIES THEWAYMAKER-LETTER-OF-EXPLANATION-AND-G-COMPLIANCE THEWAYMAKER-SITE-PLAN-APPLICATION-91824 THEWAYMAKER-TRANSMITTAL-LETTER-9-18-24 THEWAYMAKER-VARIFICATION-OF-TAXES-PAID WayMaker-letter - Board Attorney Letter (Dated 12.4.24) 23-1345-008-PB-24-19-40-Eagle-Ridge-Way-Engineering-Review-Revised-8-Jan 2025 Affidavit-of-Mailing-and-Publication-11625 EX-I-1 EX-Pool-1-Temp-Drainage--Control-Berm EX-Pool-2-Temp-Drainage-Control-Berm EX-Pool-3-Uncovered-Boulder-Wall EX-Pool-4-Uncovered-Boulder-Wall EX-Pool-5-Historical-Photo-of-Boulder-Wall-Google-Earth-July-4-2007 EX-Pool-6-West-Orange-Approved-Grading-and-Drainage-Builders-Copy-3623 EX-Pool-7-Zayibeth-Stormwater-Drainage-and-Grading-Review-Memo-3323 EX-Pool-8-Full-Matarrazo-Drainage-System-Approved-by-Town-3623 EX-Pool-9-Installation-of-Approved-Drainage EX-Pool-10-Township-Project-Inspection-Activity-Reports EX-DD-1-Historical-Imagery EX-DD-2-CP-Authorizing-Resolution EX-DD-3-HPE-Pipe-from-CP-under-ERW-to-Ditch EX-DD-4-HPE-and-RCP-Daylight-into-Ditch-on-40-side-of-Eagle-Ridge-way

File revisions (1)