Supporting Documentation · Date unavailable
PB-24-13 IMMC Health/CACS Block: 172.02 Lot: 6
1fccb8d585508d243ebfcd5b3a79cb435240f9ec2f037c7ec1059373078831f9Indexed text · page 7
Show all pages6. Applicant agrees to comply with all recommendations set forth in the report of Phillip Scott, P.E. dated September 16, 2024, with the exception of item 3.9 related to Belgium block curbing which the township engineer will review with Applicant as to the necessity of same. 7. The parking lot will be completely repaved and re-striped and final paving and striping must be completed and approved by the municipal and/or board engineer before a Certificate of Occupancy will be issued. 8. Before repaving the parking lot, Applicant shall consult with the Township Engineer to determine the direction of drainage. 9. Applicant agrees to comply with the recommendations of Mr. Haizel in his report of September 13, 2024. 10. A lighting plan (Item 44 on the Site Plan Checklist) will be submitted. 11. Any conditions not completed as to the site plan approval issued in PB 22-04 are adopted here as set forth at length and Applicant shall comply with each of those conditions that are still open. 12. A final survey will be submitted at the conclusion of the project. 13. Applicant shall list all conditions of approval onto a final site plan submission. The undersigned secretary certifies the decision set forth herein was made by this Board on January 8, 2025, and memorialized herein pursuant to N.J.S.A. 40:55D10(g) on January 22, 2025.
File revisions (1)
- Sep 29, 2026
1fccb8d585503,576,813 bytes