Supporting Documentation · Date unavailable
PB-24-19 TheWayMaker LLC Block: 106 Lot: 20.03
3a421468bcb5c4ae921a3855e47a958b8ebdbf221b75bab1c57cd5c38d1769feIndexed text · page 11
Show all pagesgrading, final boulder walls, and landscaping consistent with the Applicant’s site plan and exhibits presented to the Planning Board; and IT IS FURTHER RESOLVED that the approval granted to TheWayMaker, LLC, is subject to the following terms and conditions: is The Applicant shall comply with all applicable Township, County, State and Federal laws, ordinances, regulations, and directives, including without limitation, obtaining all applicable local, state, and federal approvals, or permits. Without limitation of the foregoing, prior to the signing of the approved site plans, and prior to the commencement of any land disturbance or construction but excluding interior renovations, the Applicant shall submit to this Board, with a copy to the Board Engineer, proof that it has obtained all required governmental land use approvals for the Stormwater Management System and driveway, landscaping, removal of the concrete pipe (replacing it with riprap and a minimum of two check dams), enlargement of the scour hole, and construction of the two-tiered boulder wall. If another governmental entity or agency grants a waiver or a variance inconsistent with the terms of this Resolution of Approval or materially affecting the plans and/or exhibits submitted by the Applicant, which has the impact of vacating this approval of the stormwater management system or the conditions attached, then the Applicant shall re-apply to this Board respecting the same and this Board shall have the right to view that issue as it relates to this approval and these conditions and modify and amend same, if appropriate. This condition shall not apply to the terms of the private Settlement Agreement between the Applicant and Objector.
File revisions (1)
- Sep 29, 2026
3a421468bcb56,728,331 bytes