Supporting Documentation · Date unavailable
PB-24-19 TheWayMaker LLC Block: 106 Lot: 20.03
3a421468bcb5c4ae921a3855e47a958b8ebdbf221b75bab1c57cd5c38d1769feIndexed text · page 13
Show all pages10. 12. Applicant’s engineer will supply the full calculations used in creating the plan modifications shown on A-1 submitted to the Board. In accordance with Exhibit A-1 submitted at the hearing on April 16, 2025 by expert engineer Cokeley, the Applicant will remove the elliptical pipe in its entirety and replace it with a riprap lined ditch with stone check dams and install a double sized scour hole at the end of that ditch. Should this work to remove the concrete elliptical pipe and replace same with a riprap ditch require approvals from a municipal, county and/or state government, the Applicant will diligently file for these approvals, which filings shall not delay the work proceeding under the prior permit or on the approved stormwater management system, driveway and landscaping associated with 40 Eagle Ridge Way for which permits may proceed. Applicant will install additional ground cover and landscaping as shown on A-1 submitted to the Board and as approved by the Township Forester and relocate the drainage ditch as provided in Exhibit B, subject to the terms of the Settlement Agreement. The Planning Board makes no findings with respect to any work or enhancements intended to be implemented on the neighboring property located at 42 Eagle Ridge Way, other than to say that the proposed landscaping and potential drainage ditch re-location is as per the Settlement Agreement with the Llewelyn Park Board of Managers, the owner of 42 Eagle Ridge Way and Applicant and enforcement of that Settlement Agreement is between those parties. The landscaping and drainage improvements identified in the exhibits to the Settlement Agreement presented and signed by Richard Cohn dated April 16, 2025
File revisions (1)
- Sep 29, 2026
3a421468bcb56,728,331 bytes