Supporting Documentation · Date unavailable
PB-24-19 TheWayMaker LLC Block: 106 Lot: 20.03
3a421468bcb5c4ae921a3855e47a958b8ebdbf221b75bab1c57cd5c38d1769feIndexed text · page 4
Show all pagesand the drainage facilities, some of which have been constructed and others to be constructed as part of the within application. When the pool building and inground pool construction began less than an acre of land was anticipated to be disturbed; however, during construction it was determined that more than an acre was disturbed, and site work was stopped pending approval from the Planning Board. TheWayMaker, LLC owns 40 Eagle Ridge Way and Richard Cohn, the manager, resides there with his wife and son. Mr. Cohn and his family, residents of West Orange since 1997, moved to 40 Eagle Ridge Way in May of 2021 and began designing a pool and pool house. They applied for and received permits for the construction of both the pool and pool house. Applicant hired Grabowski Construction to perform the site improvements and as part of the improvements, during excavation, the contractor created a temporary berm to act as a moat. Also, during the course of construction, a boulder wall was built up as an interim measure until the storm water system could be installed and then the plan shows that the wall area would be reduced to two tiered walls, each below the maximum height permitted by Code. Hudson-Essex-Passaic Soil Conservation District (“HEPSCD”) issued instructions to the Applicant to clean out the drainage ditch located on the property and install riprap in the stormwater ditch and at the conduit outlet.
File revisions (1)
- Sep 29, 2026
3a421468bcb56,728,331 bytes