Show all pages22. 23: 24. the elliptical pipe, does not require a steep slope variance and the Board accepts the testimony of Mr. Scott. Mr. Scott also confirmed that there was stormwater flowing through the 36” elliptical pipe and a source of that water appeared to be from Crystal Pointe, the townhouse community located across the street from the Applicant’s property. Mr. Scott confirmed that the proposed stormwater management system complies with the Township Ordinances for stormwater management and the Board accepts the testimony of Mr. Scott that the proposed system adequately captures the storm water created by the soil disturbance created on Applicant’s property. In addition to the proposed stormwater system, that complied with the Township’s Ordinances for stormwater management as to the Applicant’s property and proposed improvements the Applicant’s engineer worked with the engineer retained by the Objectors and proposed additional enhancements to the stormwater management system that include installing a second curtain drain on the lawn area adjacent to the second wall tier, doubling the size and depth of the scour hole at the end of the stormwater drainage ditch where the outfall structure adjacent to the previously installed seepage pits daylights, addition of riprap stones, and incorporating check dams adjacent to the scour hole; planting a mix of groundcovers and evergreen shrubs, with amount/types/species identified on Exhibit A of the Settlement Agreement as soon as possible (no later than the next planting season), planting a mix of groundcovers, trees and evergreen shrubs on 42 Eagle Ridge Way (as per agreement with owner of 42 Eagle Ridge Way) as per Exhibit B of the Settlement Agreement; and, removing the elliptical pipe located at
File revisions (1)
- Sep 29, 2026
3a421468bcb56,728,331 bytes