Supporting Documentation · Date unavailable
PB-25-05 WO Board of Ed/Mt Pleasant Elementary School Block: 172 Lot: 29.01
ce59a5a29aef392198a916f9d48f7fd3251bd6567268774e107729ddcb5ed544Indexed text · page 4
Show all pageskindergarten space. The development proposed is in response to the need for additional pre-kindergarten classrooms as articulated in the Township’s Master Plan. 17. The Board finds that the proposed project and capital improvement consistent with the goals and objectives of the 2019 Master Plan Update. NOW, THEREFORE, BE IT RESOLVED by the Planning Board of the Township of West Orange that it finds the proposed project and capital improvements are consistent with the Township of West Orange Updated Master Plan. NOW, BE IT FURTHER RESOLVED by the Planning Board of the Township of West Orange that the following recommendations are made with respect to the proposed capital improvements: 1. Additional landscaping should be added to the site (in light of the increase in impervious coverage.) 2. Applicant should submit a security plan to be revised by the Police Department and which the Board urges that security cameras be installed as part of that security plan. 3. The Applicant should work with the Township Engineer such that the walkways from the proposed building to the play area should be made ADA compliant. 4. Basic Phase I testing for ground contamination should be done and the results supplied to the Township Engineer to determine if further soil testing should take place. 5. Adequate lighting on the building, drive aisle and parking lot should be installed.
File revisions (1)
- Sep 29, 2026
ce59a5a29aef2,309,178 bytes