Town CrierWest Orange, New Jersey
← Back to search

Minutes · Jul 16, 2025

July 16, 2025, Planning Board Special Meeting Transcript - WEHI

Preserved file SHA-256e0f092e09661deac64655e475ade9625fba66d099ab655e08cacb04c63bb6922

Indexed text · page 24

Show all pages
Page 24

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 24 length of the building and also entrances to the parking garage which required them to move the building to the east in order to get between the wetland transition area and the building structure itself. And so that's a pretty significant difference. It's actually putting the building right -- if you look at the plans or been out at the site, there's like a knob on the top of the property as, based on the topography and basically the building used to be behind that knob and now it's on top of that. MR. AFRAN: May I interrupt for a moment. Mr. Goll asked if we could get the report on screen, it is now available apparently, so if you need to refer to any pages on the screen. THE WITNESS: Thank you. All right. Thank you very much. I appreciate it. A. So that's just one thing I wanted to understand is actually, usually instead of getting less conservative they moved it toward the slope. The steep slope for this project site. So one of big the things, the big things that I found in the report is that the slope stability, the parameters that were used do not match the actual conditions. They actually used a RQD of 67 percent throughout the document, throughout the analysis. They

File revisions (1)