Minutes · Jul 16, 2025
July 16, 2025, Planning Board Special Meeting Transcript - WEHI
e0f092e09661deac64655e475ade9625fba66d099ab655e08cacb04c63bb6922Indexed text · page 54
Show all pages1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 54 they put it right next to the slope for their parking lot. Between there and the wetlands. They didn't want to get a permit for the lot. MR. KLEIN: So if they want to try to get a permit they possibly could do it? THE WITNESS: Sure. I guess. I don't know why they didn't. MR. KLEIN: All right. CHAIRMAN BAGOFF: Mr. Guarino. MR. GAURINO: That was my question, so thank you, Chairman. CHAIRMAN BAGOFF: Mr. Alper. MR. ALPER: Sure. Thank you. Are you saying that it's unstable to build or that there is not enough information to tell if it's unstable to build? THE WITNESS: I think it's not necessarily responsible to build that close to the slope. This Township is no stranger to landslides, it's occurred before. So to have that information I would say, yeah, there's not enough -- the information is not robust enough. The analysis was not done in a manner that would provide myself at least with any confidence that nothings going to happen or there's going to be no failure of the slope.
File revisions (1)
- Sep 29, 2026
e0f092e09661953,833 bytes