Town CrierWest Orange, New Jersey
← Back to search

Minutes · Jul 16, 2025

July 16, 2025, Planning Board Special Meeting Transcript - WEHI

Preserved file SHA-256e0f092e09661deac64655e475ade9625fba66d099ab655e08cacb04c63bb6922

Indexed text · page 64

Show all pages
Page 64

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 64 detect vibrations and if it goes above a certain vibration amount, then they have to actually figure out something else to do or stop what they're doing until they could figure out to make sure the slope isn't damaged. THE PUBLIC: Is it possible that they would be doing after they start and would have to stop and there would be no solution, is that a possibility too? THE WITNESS: I can't answer that, I don't know. I mean, it's, it would be site specific but I would imagine, you know, it is there to make sure that they're -- they might just have to change the method of where they're excavating. THE PUBLIC: Do I understand what you were saying, there is a possibility after this building is up that there could be some sagging in one area of the building? THE WITNESS: No, I never said that. I never said there would be sagging. THE PUBLIC: Is there a possibility based on all the information about the rock, the blasting? THE WITNESS: If the slope were to destabilize underneath the building, then yeah. THE PUBLIC: It could happen? THE WITNESS: It could settle, yeah.

File revisions (1)