Town CrierWest Orange, New Jersey
← Back to search

Minutes · Jul 16, 2025

July 16, 2025, Planning Board Special Meeting Transcript - WEHI

Preserved file SHA-256e0f092e09661deac64655e475ade9625fba66d099ab655e08cacb04c63bb6922

Indexed text · page 81

Show all pages
Page 81

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 81 the site of it. We're putting it in the same place. It's going to look very familiar, slightly elevated, but you see the water going up to that building which is a concern of ours given the equipment of the water treatment facilities going to be in that building roughly at the same elevation. So, again, Canoe Brook is to your right, it goes basically behind that building. So now you're seeing overflow in a storm where the banks of Canoe Brook overflow. You'll see the entire span of it but eventually I'm going to reference the distance between that left edge of that building and one of the questions I got is, I described it as 150 yards roughly of overflow, right. Streams normally ten feet. They said, how do you know it's 150 yards. Well, I know because basically I measured it. The left edge of that building and where that water is to what I will show on the right side as the camera pans out, which is the green on this Country Club. So if you stop right there. You're starting to see on the right the small white building, that is a well. That's a well house. So basically the well house, basically the water is up to the edge of it. We talked a little about my concern about water under the current conditions, but

File revisions (1)