Town CrierWest Orange, New Jersey
← Back to search

Minutes · Jul 16, 2025

July 16, 2025, Planning Board Special Meeting Transcript - WEHI

Preserved file SHA-256e0f092e09661deac64655e475ade9625fba66d099ab655e08cacb04c63bb6922

Indexed text · page 82

Show all pages
Page 82

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 82 certainly under future conditions all the water getting into the well, contaminating the well. So that well, we're not doing anything with that. That's remaining where it is, so that's one of our concerns. You see, it gets inside, it's not under water yet, but it's close. Continue, please. All right. So stop right there for a second. Yeah, so stop right there. In the 150 yard estimate what you're seeing, that's still sort of looking at some of our buildings. If you go a little bit forward in distance. Right there is fine. In the distance toward the right of this picture, this is a golf course believe it or not. Can't quite tell right now, it's underwater. But the far right is the green for the first hole of Essex Fells. Basically if you look at the span of this, and similar pictures that I received and I regularly see myself when it rains, if you measure that left edge of that building, that's what I call the storage building, our future PFAS treatment facility, to the right edge of that water, which is not completely covering green, but up to the front of it, that's specifically, if you measure it, it's 516 feet. That's 172 yards. To be fair, I kind of rounded down and said 150, but that's a standard, you know, condition today when we have a

File revisions (1)