Town CrierWest Orange, New Jersey
← Back to search

Minutes · Sep 3, 2025

September 3, 2025 Planning Board Regular Meeting Transcript - WEHI

Preserved file SHA-25647b2acfdea8871712f9440b8d1cc96ebcdcbd1b543faba9a727512575efabc4d

Indexed text · page 29

Show all pages
Page 29

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 29 was not gathered on all of them. And what they did was they indicated what the input would be for the project with the volume but not with the volume plus the existing volume. But just the proposed volume alone and you need to look at the proposed volume as well as the existing to see what the input -- impact is for the changes and that has to be done yet. And in addition there are numerous site problems. Site distance problems caused by the slope, the steep hills and the curves. You have cars that are parked on a curve, that are parked perpendicular to the curb on some of project coming into the building. You have slopes that go into the garage that are in excess of ten percent. You have a major problem with sidewalks. Well, sidewalk problem is one because the driveway have such steep slopes on them and the roads have steep slopes on them that the driveway have, and the areas where the interconnections are, the roadways itself are over ten percent in grade and if the roads are ten percent in grade the question is, what do you do with the sidewalk. You can't put it at ten percent because the maximum ADA allows you is five percent. So if ADA calls for five and RSIS gets ten, you have a problem. You need sidewalk on both sides of the street, according to the RSIS guidelines. But the RSIS guidelines are the

File revisions (1)