Minutes · Sep 17, 2025
September 17, 2025, Planning Board Special Meeting Transcript - WEHI
b2a0836e9584b727d7fc0751bc680307a9a115b95f59a7aa60a9c84432d40cd3Indexed text · page 62
Show all pages1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 62 1.5 number, I believe, and the number, the 2.0 number from Princeton Hydro. And I just want to make sure I understand you correctly. So if I understand you correctly you're saying that neither the 1.5 nor the 2.0 number guaranties that the slope won't collapse. That the difference is based on the amount of damage that would be done if the slope collapsed. So the U.S. Engineers base it on, because the damage, you said would wipeout a whole city, they require 2.0 and because if this slope happened to collapse it would only wipeout maybe half a dozen houses, 1.5 is an adequate number, is that what you're saying? THE WITNESS: No, that's not it. 1.5 -- a factor safety of 1.0 means that the forces that tend to drive failure are equal to the forces that tend to resist failure. So at 1.5 you're 50 percent higher, you know, 50 percent more resisting forces than you have driving forces. At 2.0 you have twice the number amount of driving -- of resisting forces relative to the driving forces. So in both cases the slope is stable. THE PUBLIC: So why would they U.S. Engineers have a different number than you, if that's the case? THE WITNESS: Well, the U.S. Core of Army Engineers they -- I suppose you have to ask them why
File revisions (1)
- Sep 29, 2026
b2a0836e95841,242,504 bytes