1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 70 THE WITNESS: As long as the material -- as long as the methods that are used to excavate are controlled the -- we're talking about really no over breaks, so it's within, I don't know, a foot or two at the most. THE PUBLIC: And the other question is, what is the role of the geotech person with the developer? You guys recommend what they should use, how do you guys interact? THE WITNESS: Are you talking about -- well, at this stage, are you talking about during construction? THE PUBLIC: Both. THE WITNESS: So we are asked to provide services, which in this case is to analyze the stability of the slope and we made recommendations -- we analyzed conditions and made recommendations. During construction, if we were to be retained, we would have a specific scope of work and that might be monitoring or inspecting some activity. THE PUBLIC: Do you make recommendations as to modality for excavation? THE WITNESS: We make recommendations on the type of excavation that would be appropriate or that could be used and then the contractor has to choose. We

File revisions (1)