Minutes · Sep 17, 2025
September 17, 2025, Planning Board Special Meeting Transcript - WEHI
b2a0836e9584b727d7fc0751bc680307a9a115b95f59a7aa60a9c84432d40cd3Indexed text · page 75
Show all pages1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 75 comment on that report? A. Yes. Q. Okay. Please go ahead. A. Certainly. So at the last meeting Mr. Litwornia presented his findings, a report and slides that proffered several assertions with regard to this application that I think require correction and/or clarification. There's several broad categories that he touched on, but I think the first one is probably, first and foremost the most important one and it is the characterization and the determination of the circulation system within the site and how it is derived. Mr. Litwornia -- CHAIRMAN BAGOFF: One second, sir. Go right ahead. Thank you. A. Thank you. Mr. Litwornia is correct that the Residential Site Improvement Standards that are published by and governed by the DCA are the governing standards for this site. Under those standards Mr. Litwornia made, offered the, or proffered the opinion that the site circulation roadways of this project and it's circulation system would be categorized as a cul-de-sac and as a result based upon the cul-de-sac standards, and he actually mixed and matched the standards between a standard
File revisions (1)
- Sep 29, 2026
b2a0836e95841,242,504 bytes