Agenda · Dec 18, 2025
December 18, 2025, Regular Meeting
31af387ee0b831b51277599f5d8009b15005d539567b634cf51a8eabc9d8d138Indexed text · page 4
Show all pages4 3.) ZB-24-15 Waystone Realty LLC (Carried from September 18, 2025) 42 Eagle Ridge Way Block: 106; Lot: 24.01; Zone: R-1; Application for Preliminary and Final Major Site Plan Approval with D Variances. Application-for-42-ERW Burgis-Variance-Discussion---42-Eagle-Ridge-Way-1 Copy-of-12-27-letter-to-WO EX-1-PB-98-11---Highview-at-West-Orange---Resolution-Adopted-See-Last-Paragraph Letter-10-18-of-Explanation-for-42-ERW 200-foot-radius-list-for-42-ERW Part-of-Letter-of-Explanation-for-42-ERW /240515---42-Eagle-Ridge-Way---West-Orange---SCD-2024-06-12-1 241018_42-ERW-Layout_s 241018_42-ERW_Stormwater-Report_compiled 241220_42-ERW-Full-Civil-Set-FINAL 241220_42-ERW_Stormwater-Report-FULL Application-for-42-ERW-2 42-Eagle-Ridge-Way-ZB-24-15-Planning-Review---January-28-2025 23-1345-010---ZB-24-15---42-Eagle-Ridge-Way---Engineering-Review Noticing Documents (rcd 6-2-2025) Chronicle-Proof-of-Publication-Waystone (rcd 6/2/25) Star-Ledger-Proof-of-Publication-Waystone (rcd 6/2/25) Proof-of-Mailing-Page-3-of-3-waystone (rcd 6/2/25) Proof-of-Mailing-Page-2-of-3-Waystone (rcd 6/2/25) Proof-of-Mailing-Page-1-of-3-Waystone (rcd 6/2/25) 250701_42-ERW_Stormwater-Report (rcd 7-02-2025) 240515---42-Eagle-Ridge-Way---West-Orange-Survey(rcd 7-02-2025) 42-ERW-House-Plans(rcd 7-02-2025) 42-ERW-Barn-and-Arena-Plans(rcd 7-02-2025) 250701_JF_Response-Letter(rcd 7-02-2025) 15298/O2Compost-SOQ-Comprehensive(rcd 7-02-2025) 15297/Letter-7-2-25-to-WO-Waystone(rcd 7-02-2025) 15295/250701_42-ERW-Full-Set-Rev(rcd 7-02-2025) Letter-7-2-25-from-Colliers-Waystone(rcd 7-02-2025) Engineering-Review-No-2-Sept-2-2025 (rcd 9-2-25) ZB-24-15-Planning-Review-Rev-1--September-2-2025 (rcd 9-2-25) VERIFICATION-OF-TAX-AND-SEWER-CHARGES-PAID (rcd 9-4-2025) 12-3-2025 Preliminary & Final Major Site Plan (rcd 12-4-2025) 12-3-2025 Stormwater-Report (rcd 12-4-2025) 12-5-2025 - Ltr from P. Moon to R. Cohn re- compost (rcd 12-8-2025) Link mentioned in 12-5-2025 Ltr from P. Moon to R. Cohn re- compost (rcd 12-8-2025) 12-16-25--ZB-24-15---Town-Forester-Memo---rcd-12-16-2025 12-16-2025-ZB-24-15_42-Eagle-Ridge-Way_Engineering-Review-3 (rcd 12-16-2025) 12-16-25-Waystone---CME-Planning-Review-1 (rcd 12-17-2025)
File revisions (1)
- Sep 29, 2026
31af387ee0b8368,674 bytes