Agenda · Jul 16, 2026
July 16, 2026, Regular Meeting
ce2f8f746e399c85a229062c43f3503fe14d85ff0d3f813d28b3b381cd5f5454Indexed text · page 3
Show all pages26-04-06--Consultant-Engineer-Review-2-rcd-4-8-2026 Ltr-Chander-encl-documents-noticing Consent to Continuance from W. Sullivan (rc 6-24-2026) 2.) ZB-25-07 Mavis Tire (Carried from 5/28/2026) 460 Prospect Avenue Block 105, Lot 64.01 The applicant proposes to remove the existing structure and construct a tire center / motor vehicle service station with seven service bays and a retail sales area encompassing 1,142 square feet including a showroom, sales counter, waiting area, and bathrooms. A d-1 use variance relief is required to permit a motor vehicle service station in the general commercial district. Completed-Prelim-and-Final-Site-Plan-Checklist-submission ALTA_NSPS-Survey-Last-Revised-12-17-2024-submission Planning-Report-072225-submission Mavis_West-Orange---Application-Filing-Planning-Report Architectural-Plans-06-30-2025-submission Corporate-Disclosure-submission 200-Foot-List-07-09-2025-submission Prior-Resolutions-of-Approval-submission Title-Documents-submission Verification-of-Taxes-Paid-07-08-2025-submission Site-Plan-Set-07-16-2025-submission Executed-Tree-Removal-and-Replacement-Application-submission Executed-Zoning-Board-Application-Form-submission Completed-Sustainability-Checklist-submission Traffic-Impact-Study-07-21-2025-submission List-of-Variances-and-Waivers-07-2025-submission Geotechnical-Engineering-Report-Addendum-No-1---Results-of-Testing-01-29- 2025- submission Geotechnical-Engineering-Report-12-10-2024-submission Drainage-Statement-07-2025-submission CME Engineering 25-09-29-Review-1 CME Planning
rt-Addendum-No-1---Results-of-Testing-01-29- 2025- submission Geotechnical-Engineering-Report-12-10-2024-submission Drainage-Statement-07-2025-submission CME Engineering 25-09-29-Review-1 CME Planning 25-10-23-Mavis-Tire--Planning-Review-1 Tree-Removal-Report-Feb-2026rcd-2-26-2026 Tree-Removal-Report-Feb-2026-resubmissionrcd-2-26-2026 Traffic-Impact-Study-021226-resubmissionrcd-2-26-2026 Stormwater-Permit-Application-Feb-2026-resubmissionrcd-2-26-2026 Stormwater-Management-Report-Feb-2026-resubmissionrcd-2-26-2026 Stormwater-Management-Operation-and-Maintenance-Manual-Feb-2026- resubmissionrcd-2-26 Site-Plans-revised-021626-resubmissionrcd-2-26-2026 Planning-Report-021726-resubmissionrcd-2-26-2026 List-of-Variances-and-Waivers-Feb-2026-resubmissionrcd-2-26-2026 Grading-Checklist-Feb-2026-resubmissionrcd-2-26-2026 Filing-Letter-resubmission-022426rcd-2-26-2026 Architectural-Plans-021226-resubmission-rcd-2-26-2026 ZB-25-07-Mavis-Tire-460-Prospect-Ave-updated-332026---Forrester-Report-rcd-3-3- 2026 Tree-Removal-Report---Mavis---LaMana-ver-01-signed-Mar-2026-rcd-3-24-2026 DB-1101-PG-170-rcd-3-31-2026 DB-3639-PG-248-rcd-3-31-2026
File revisions (1)
- Sep 29, 2026
ce2f8f746e39421,783 bytes