Town CrierWest Orange, New Jersey
← Back to search

Agenda · Jul 16, 2026

July 16, 2026, Regular Meeting

Preserved file SHA-256ce2f8f746e399c85a229062c43f3503fe14d85ff0d3f813d28b3b381cd5f5454

Indexed text · page 4

Show all pages
Page 4

26-03-25-Mavis-Tire---Planning-Review-2 26-03-25-CME-Engineering-Review-2 RE_-Mavis-Tire-Supply-LLC-Review-2---Blueberry-Bend RE_-Mavis-Tire-Supply-LLC-Review-2---Blueberry-Bend-1 ZB-25-07-Mavis-Tire-460-Prospect-Ave-Forester-Memo-updated-3242026 2026-05-05-Response-Letter-rcd-5-6-2026 Prelim-and-Final-Site-Plans---Rev-2-Combined-rcd-5-6-2026 2026-05-Storm-Water-Management-Report-rcd-5-6-2026 2026-05-Operations-and-Management-Manual-rcd-5-6-2026 Dynamic-Mavis-Tire-Supply-LLC-West-Orange-Site-Plan-Rendering (rcd 5-18-2026) Roof-Plan (rcd 5-18-2026) 2026-05-15-Transmittal-for-Exhibits (rcd 5-18-2026) Dynamic-Mavis-Tire-Supply-LLC-West-Orange-Aerial-Map-Exhibit (rcd 5-18-2026) Scanned-Roof-Plan---Signed-and-Sealed (rcd 5-18-2026) Affidavit-of-Proof-of-Publication-and-Service-Mavis (rcd 5-18-2026) 26-05-19-Engineering-Review-3 (rcd 5-19-2026) 5-22-2026-Email-Response-from-L-John-Basta-to-Consulting-Engineer-rcd-5-26-2026 Filing-Letter-resubmission-063026-4927-7290-6681-v1 (received 7-1-2026) Option-B-Building-Rendering-with-higher-parapet-and-view-from-2nd-floor-residence- behind-resubmission-4929-5919-8137-v1 (received 7-1-2026) Traffic-Study-revised-062626-resubmission-4933-0058-5912-v1 (received 7-1-2026) Architectural-Plans-revised-062926-resubmission-4901-1312-8633-v1 (received 7-1- 2026) Acoustical-Analysis-062826-resubmission-4901-2414-2009-v1 (received 7-1-2026) 26-07-08-Consulting-Engineer-Review-4-rcd-7-8-2026 26-07-10-Mavis-Tire-Planning-Review-3-rcd-7-10-2026 3.) ZB-25-10 Seton Hall Preparatory (Carried from 5/28/2026) 700 Prospect Avenue Block 82.01 Lot 1 Zone: R-1 Residential District [Application only appearing with preservation of notice to schedule to another meeting. No testimony provided/nor a vote on this application tonight.] The Applicant seeks to amend certain conditions of that approval established under Resolution ZB-08-37, including limits on the operation and to install lighting on the football field and parking

Page 4

ht.] The Applicant seeks to amend certain conditions of that approval established under Resolution ZB-08-37, including limits on the operation and to install lighting on the football field and parking lot. Executed-Application-with-Attachment-submission Architectural-Plans-05-21-2025-submission Completed-Checklist-submission Prior-Resolutions-of-Approval-submission Completed-Sustainability-Checklist-submission 200-Foot-List-07-10-2025-submission Verification-of-Taxes-07-10-2025-submission \ZB-23-09-Seton-Hall-Preparatory---Resolution-submission REVISED-Executed-Application-with-Attachment-submission Planning-Report-01-09-2026 26-03-04-Seton-Hall-Prep-Fields---Planning-Review-1-rcd-3-5-2026

File revisions (1)