Town CrierWest Orange, New Jersey
← Back to search

Agenda · Oct 29, 2026

October 29, 2026, Special Meeting

Preserved file SHA-25699830e45ece21733a13d5062266baffc2f94079c264102ae5dcbdacef6e5fd98

Indexed text · page 2

Show all pages
Page 2

F. SWEARING IN Township Professional(s) G. APPLICATION 1.) ZB-25-07 Mavis Tire (Carried from 9/17/2026) 460 Prospect Avenue Block 105, Lot 64.01 The applicant proposes to remove the existing structure and construct a tire center / motor vehicle service station with seven service bays and a retail sales area encompassing 1,142 square feet including a showroom, sales counter, waiting area, and bathrooms. A d-1 use variance relief is required to permit a motor vehicle service station in the general commercial district. 9-18-2026--CONSENT-TO-CONTINUANCE-EXTENSION-OF-HEARING-TO-Oct-29-2026---L-John- Basta 8-28-26 -Planning-Review-4- C.Dochney 8-26-2026 Filing-letter w previous mtg exhibts frm L. John Basta to D. Chandler 8-24-26 - Updated-Landscape-Rendering - R. Ritchie 8-12-26 Updated-Rendering-and-Sight-Line - Larson Design Group 7-29-26 - Option-B-Building-Rendering-with-higher-parapet-and-view-from-2nd-floor- residence-behind -Larson Design Group 7-10-26-Planning-Review-3-C. Dochney 7-8-26 Consulting-Engineer-Review-4- R.MacNeill 6-26-26 Traffic-Study-revised - Dynamic Traffic 6-29-26 -Architectural-Plans-revised- Larson Design Group 6-28-26 - Acoustical-Analysis-resubmission-Ostergaard Acoustical Associates 6-30-26 - Filing-Letter-resubmission- L. John Basta to D.Chandler 5-22-2026-Email-Response-from-L-John-Basta-to-Consulting-Engineer 5-19-26-Engineering-Review-3 -J. Hess 5-18-26 Site-Plan-Rendering - R. Ritchie 2-12-26 Roof-Plan - Larson Design Group 5-15-26 - Transmittal-for-Exhibits -Dynamic\ 5-18-26 - Aerial-Map-Exhibit - Dynamic Engineering 5-14-26 - Scanned-Roof-Plan-Signed-and-Sealed -Larson Design Group 5-18-26 - Affidavit-of-Proof-of-Publication-and-Service- L.John Basta 5-5-26 Response-Letter-Dynamic Engineering 4-27-26 - Prelim-and-Final-Site-Plans---Rev-2 -Dynamic Engineering 5-2026-Storm-Water-Management-Report - Dynamic Engineering 5-26 -Operations-and-Management-Manual- Dynamic Engineering 3-30-26 - Email Response to Engineering Review 2 - L. John Basta 3-30-26 - Email Response to Engineering Review - L. John Basta 03-25-26 - Planning-Review-2 - C. Dochney 03-25-26 - Consultant Engineering-Review-2 - J. Hess 3-24-26 - Forester-Memo-updated- W. Kipp 3-3-26 - Forrester-Report- W. Kipp 3-26 Tree-Removal-Report---Dynamic Engineering Deed Deed

File revisions (1)