Show all pagesMr. Schkolnick asked the Board to confirm that Mr. Cote was qualified as an expert. He stated that Mr. Cote had already been qualified and that he wanted to make sure this was recognized for the record. Dr. Bagoff confirmed that everything done at the previous meeting continued to apply. Mr. Cote explained that he would go through the site civil plan set that was delivered in conjunction with the testimony of Ms. Cancellari and Mr. Pehnke. Mr. Cote began with the drawing presented at the previous hearing, identified as Exhibit Al for reference. He stated that the drawing was labeled “Project Aerial Map,” with drawing number EX05, dated June 1, 2026. Mr. Cote explained that, with north shown to the right of the site, the area containing the bulk of the proposed improvements is located between Laurel Avenue and Eagle Rock Avenue. Mr. Cote stated that he would go through the components of the on-site improvements and then switched to the site plan set proper. Mr. Cote explained that the site plans are divided into an east and west side for purposes of the sheet layout. He stated that, in terms of orientation, the Laurel Avenue and Eagle Rock Avenue intersection is shown on the westerly sheet, while Oval Road and the Crestmont Country Club driveway are shown on the easterly side. Mr. Cote began describing the westerly portion of the site. He stated that one of the improvements is the addition of a stormwater basin located at the intersection of Laurel Avenue and Eagle Rock Avenue. Mr. Cote explained that the stormwater basin will serve multiple purposes, including water quantity and water quality treatment for the site. Mr. Cote then described the entrance from Laurel Avenue. As one progresses into the site through the Laurel Avenue entrance toward the portico and main entrance to the building, the proposal includes an additional parking area adjacent to the existing parking. Mr. Cote stated that he would refer to this as the “upper level parking” in reference to the next drawing. The proposed upper-level parking area would contain 39 parking spaces and two EV parking spaces and would connect to the existing parking lot as an addition, essentially extending the parking area toward the north of the site. Mr. Cote also addressed comments from the engineers’ and planners’ letters. He explained that one of the EV spaces would be required to be an ADA EV
ing the parking area toward the north of the site. Mr. Cote also addressed comments from the engineers’ and planners’ letters. He explained that one of the EV spaces would be required to be an ADA EV space. Mr. Cote stated that the ADA EV space would be provided by using the existing ADA space on the site and accommodating the requirement for one EV space to be an ADA space. Mr. Cote then returned to the orientation of the western side of the site, where the stormwater basin and parking lot are shown together. Mr. Cote then identified the widening of Eagle Rock Avenue as another component of the improvements. Mr. Cote explained that part of the widening involves grading Eagle Rock Avenue in accordance with Mr. Pehnke’s testimony to level off the area adjacent to the roadway and provide a level area. Mr. Cote stated that a wall is proposed along the frontage and that it will run along the length of Eagle Rock Avenue from Laurel Avenue into the proposed new intersection. Mr. Cote then switched to the easterly site plan sheet. Mr. Cote explained that the easterly partial site plan shows the intersection discussed in Mr. Pehnke’s earlier testimony, including Eagle Rock Avenue and the on-site improvements associated with the new egress drive. Nu Ss
File revisions (1)
- Nov 3, 2026
06070d63f2cc21,327,306 bytes