Town CrierWest Orange, New Jersey
← Back to search

Minutes · Sep 2, 2026

September 2, 2026 Planning Board Regular Meeting Minutes

Preserved file SHA-256c1f7e5511657d93034ad90221a54ba2efb11fc0bf13267113440e8e4f5b73af7

Indexed text · page 16

Show all pages
Page 16

Mr. Panullo asked whether the sidewalk requested by Chairman Bagoff at the previous meeting would be constructed within the additional 11-foot roadway widening. Mr. Cote clarified that the 11 feet represented the asphalt widening. He explained that beyond the curb line, the County requires a cleared, relatively flat area, and the sidewalk requested by the Board could be accommodated within that area. The sidewalk would run along Eagle Rock Avenue from Laurel Avenue to the eastern end of the project or property limits. Mr. Panullo asked whether the sidewalk had already been accommodated in the plans submitted before the Board requested it. Mr. Cote stated that the sidewalk was requested after the design had been submitted and would be made a condition of the resolution. He explained that although the Township requested the sidewalk, the County would have jurisdiction over its final design. \MrvPanullo questioned ‘whether the plans currently on file provided sufficient width for the’ sidewalk and related improvements. Mr. Cote explained that the proposed plans already accommodated the necessary width and grading. He stated that the area adjacent to the curb wouldidlréady be leveled off and that the sidewalk could be installed without additional roadway widening or changes to the proposed grading. Mr. Panullo referred to Mr. Tractenberg's earlier questions concerning the proposed retaining wall; which substantially exceeds the height permitted by ordinance. He asked whether adding the sidewalk along the widened roadway and into the hillside would increase the:height of the retaining wall. Mr. Cote stated that the retaining wall would not be affected by the addition of the sidewalk. Mr, Patullo asked about previous testimony indicating that a portion of the Crestmont Country;Club property along Eagle Rock Avenue would be conveyed to the County. Mr. Cote confirmed that the proposed conveyance was shown on the plans. Mr Panullo asked how much property would be conveyed. Mr. Cote stated that approximately 9,446 square feet of land along the Eagle Rock Avenue frontage would be conveyed to the County. He explained that the strip of land would extend along the frontage and vary in width depending on the roadway geometry. Mr. Pahiillo asked whether the land conveyed to the County would also accommodate utilities arid‘infrastructure associated with the proposed traffic

Page 16

nd vary in width depending on the roadway geometry. Mr. Pahiillo asked whether the land conveyed to the County would also accommodate utilities arid‘infrastructure associated with the proposed traffic signal, including electrical power. Mr. Cote confirmed that the easements and-improvements associated with the signalized intersection would be part of the overall process. Mr. Panullo:asked whether blasting would be required for the proposed improvements hoiMr: Cote stated that he-was not aware at that time whether blasting would be necessary. Mr, Panullo asked whether a geotechnical study had been completed. Mr. Cote explained that a soils investigation had been performed for stormwater management purposes. Ms. Lori Hassell of 61 Lapis Circle, asked whether alternatives had been considered for relocating the Crestmont Country Club driveway farther along Eagle Rock Avenue toward the end of the property or farther along Laurel Avenue. She asked whether there were any negative or opposing reasons for not pursuing those alternatives instead of the proposed traffic signal and driveway alignment. Mr. Cote explained that the alternative driveway locations had previously been addressed in the traffic testimony provided by Mr. Penke. o Ms. Hassell clarified that she was asking from a civil engineering standpoint rather than a traffic standpoint. - Mr. Cote stated that the positioning of the proposed intersection was largely driven by traffic considerations and that the existing one-way entrance and exit configuration was related to the club's operations. He explained that his civil engineering review focused on grading, drainage, 16

File revisions (1)