Town CrierWest Orange, New Jersey
← Back to search

Minutes · Sep 2, 2026

September 2, 2026 Planning Board Regular Meeting Minutes

Preserved file SHA-256c1f7e5511657d93034ad90221a54ba2efb11fc0bf13267113440e8e4f5b73af7

Indexed text · page 22

Show all pages
Page 22

concentrated in a relatively small portion of the property and would provide substantial beneficial impacts. Mr. Moronski stated that the requested variances would not substantially impair the intent and purpose of the zone plan or zoning ordinance. He explained that the country club is a permitted use in the R2 zone and that the applicant was increasing the number of parking spaces while attempting to minimize disturbance. Mr. Moronski acknowledged that the proposed parking would remain well below the 700 spaces required by the ordinance but stated that the applicant was moving in the direction of improving the existing condition. He also identified the proposed sidewalk as providing additional pedestrian connectivity. Mr. Moronskireferted to. the Township's 2019 Master Plan Update, specifically Purpose 8-on page 8, whiclvaddresses providing safe and efficient transportation and circulation routes: He stated: that the objective remained relevant and included transportation modes beyond motor vehicles. Mr. Moronski stated: that West Orange had taken actions to promote pedestrian and bicyclistssafety.-Although' those efforts might not be specific to this location, he explained that the overalli Township objective was to provide options for circulation and improve safety. Mr).Movonskivalso referred to Purpose 15 on page 10 of the 2019 Master Plan Update, concerning coordination of public and private procedures and activities. He stated that this objective was:consistent with Purpose M of the Municipal Land Use Law. ‘Mr. Moronski addressed the requested site plan waiver relating to tree removal. He explained that the Planning Board may grant reasonable exceptions consistent with the general purpose and intent of the site plan ordinance. ‘Mr.\Moronski stated that the applicant proposed removing 191 trees located on slopes greater tham 0%. He explained that the justification for the waiver was similar to the justificatiorr forthe steep slope and retaining wall variances because the proposed disturbance was driven by the site's topographic conditions. Mr. Moronski stated that the overall project would remove 313 trees and that the tree replacement plan proposed well over 500 replacement trees, most of which would be planted on-site: He-explained that the tree restoration plan was included in the site plan drawings. Mr. Moronski stated that the applicant

Page 22

sed well over 500 replacement trees, most of which would be planted on-site: He-explained that the tree restoration plan was included in the site plan drawings. Mr. Moronski stated that the applicant would coordinate with the Township Forester and other Township professionals to satisfy the intent of the tree replacement ordinance. MryMoronski concluded that the requested variances could be granted under the applicable C2 criteria and, for the steep slope and retaining wall variances, the C1B criteria. He stated that the requested site plan waiver was justified by the steep slope and topographic conditions and the effort to minimize disturbance while providing the proposed improvements. Mr. Schkolnick asked Mr. Moronski whether he saw any negative impacts on the immediate neighboring properties, noting that several members of the public who had spoken lived in Essex Fells or other surrounding areas. Mr. Moronski stated that he did not see negative impacts on surrounding properties. He explained that the previous professional testimony supported the drainage and circulation improvements and that the proposed on-site improvements would also benefit Crestmont Country Club, which he described as a long-established fixture in the community. Mr. Moronski stated that the project provided both public and private benefits. He explained that the design sought to minimize tree disturbance while addressing drainage, stormwater, and roadway improvements in coordination with Essex County. He stated 22

File revisions (1)