Show all pagesapplicant would need to ensure they did not reduce the basin's storage volume and that the species could survive in wet conditions. - Mr. Noborine asked for additional information about the construction of the proposed retaining wall. Mr. Cote explained that the proposed modular block wall would have grid reinforcement extending from behind the wall back through the soil. He stated that the grid interrupts the natural soil failure plane and allows the wall to remain standing through mechanical reinforcement. Mr. Cote stated that this type of reinforced wall has been used in numerous developments throughout the area. +\ Mr. Noboririe:asked whether the same type of wall would be used uniformly throughout the site. Mr. Cote:confirmed that the type of wall would be uniform, although the coloration had not yet been determined. =...Ms. Kapferer'asked:whether there was an exhibit illustrating the steep slope impacts. Mr. ueCote displayed the steep slope exhibit EX04, dated February 12, 2026 and confirmed that the overall disturbance was approximately 3.95 acres. He explained that the steep slope disturbance was'concentrated toward the front of the site, primarily along Eagle Rock Awenue. Mr. Cote stated thatthe existing steep slope along Eagle Rock Avenue would be cut back’ to create the 10-foot area adjacent to the curb where the sidewalk would be installed: He explained that a retaining wall would be provided along the frontage for that purpose. Mr. Cote:explainéd that placing the retaining wall close to the proposed parking area: would-avoid the need: fota larger sloped embankment, which would disturb a much greater arearHe stated that the proposed design would disturb only a relatively small portion of the existingssteep slope. Mr. Cote identified another area where the proposed driveway ‘would traverse an existing steep slope. He explained that this condition would be addréssed with»a:tetaining wall on one side of the driveway and that the parking lot ting s'and drive aisle Would ‘eliminate a portion of the existing steep slope. Mr. Cote identified the areas along Eagle Rock» Avenue, the driveway, and the parking lot where steep slope disturbance wouldoccur. He stated that those areas totaled approximately 0.5 acres of : ‘steep slope ‘disturbance. Mr, Cote stated that steep slopes exist throughout the property, but the applicant was not' proposing to
cur. He stated that those areas totaled approximately 0.5 acres of : ‘steep slope ‘disturbance. Mr, Cote stated that steep slopes exist throughout the property, but the applicant was not' proposing to modify the slopes farther east and would disturb only a limited area to the west near Laurel Avenue. > 2. Ms. Kapfererasked'whether most of the steep slope disturbance involved cutting into the existing slopes or whether the work involved a combination of cut and fill. Mr. Cote stated that the work involved a combination of cut and fill. sons. Chairman Bagoff asked whether the applicant had considered making a portion of the bet detention basin a pollinator garden. Mr. Cote stated that one of the basins was designed as a vegetated basin with different planting mixes, shrubs, and trees along the bottom. He explained that the other basin was proposed with a meadow mix. - Chairman Bagoff asked whether the landscape design could incorporate plants specifically intended to create a pollinator garden. Mr. Cote stated that he would ask the landscape architect whether the proposed plantings included flowering trees or other plants suitable for pollinators and whether additional pollinator plantings could be incorporated. BOARD COMMENTS - Council President Scarpa stated that she continued to have several concerns that she did not believe had been adequately addressed, particularly concerning the steep slope variances and the significant number of trees proposed for removal. - Council President Scarpa stated that many of the trees being removed were located on steep slopes and had mature root systems. She expressed concern that replacing mature 25
File revisions (1)
- Nov 6, 2026
c1f7e551165725,244,207 bytes